Spanning from the facade and patio to the guestrooms, fitness center, and beyond, the design team’s approach to the project embraces the surrounding community
May 18, 2026
Using the momentum of JBG’s revitalization of Arlington, Virginia’s National Landing neighborhood, Calco Hospitality set out to transform an existing Marriott Hotel into an AC by Marriott, revitalizing the property and appealing to new audiences.
Completed in 2024, the single-story, 2,400-square-foot facility provides a flexible environment where students can explore books, collaborate and participate in group instruction
May 11, 2026
As part of a $90 million district-wide infrastructure improvement bond, Carpinteria Unified School District planned a new modular learning center and library for the shared campus of Canalino Elementary School and Canalino Family School.
The 11,700-square-foot building is set to be net-zero in energy usage and is designed with an unwavering approach to maximize total decarbonization across all assemblies and systems
May 6, 2026
The design team selected an all-mass timber structure, paired with wood infill walls, and wood fiber insulation; an all-wood assembly, sequestering biogenic carbon, at Passive House level energy performance; one of the first of its kind.
The newly constructed building demonstrates how Apogee Architectural Metals’ Wausau windows and Tubelite curtain wall support the comfortable, safe, therapeutic environment with a visually appealing, resilient, high-performance facade.
Where High-Performance Durability Meets Artistic Visions
April 29, 2026
After forty years, moisture and water infiltration had compromised the facade, and the Anchorage School District wanted a high-performance solution capable of withstanding the rigors of the Alaskan climate.
Erected in 1928 as the Mecklenburg County Courthouse, this historic building now serves as the Mecklenburg County District Attorney’s Office and remains one of Charlotte’s most recognizable civic landmarks
April 24, 2026
When leaks began appearing across several roof sections of the Mecklenburg County District Attorney’s Office, each constructed from different materials during past renovations, the Mecklenburg County Asset and Facility Management Department sought a solution that could preserve the structure’s integrity.
Purpose-built unit for maternal and fetal health brings consultation, delivery, and surgical care under one roof, integrated with hospitality-driven design features
April 20, 2026
Perkins&Will’s Philadelphia studio has unveiled their design for the new Advanced Delivery Unit (ADU) at Nemours Children’s Hospital
In addition to assisting with the building’s tilt-up wall design, Case’s scope also included engineering the facility’s steel framing and foundation
April 15, 2026
Case Engineering partnered with St. Charles, MO-based Knapp Engineering, LLC on the structural engineering and tilt-up design for the new $10 million Teklab environmental testing laboratory in Collinsville, IL.
Over 9,000 square feet of Kingspan’s insulated metal panels (IMPs) were selected by the architect KPA Group for the project
April 10, 2026
The new facility, just under 18,000 square feet, brings together multiple aircraft rescue and firefighting bays, a state-of-the-art general aviation terminal, and administration offices for the Contra Costa County Public Works Airports Division.