Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Breaking News

Structural Safety

NYC Tower Failure Offers Warning for Contractors

Buckled columns at the former Pfizer headquarters show how structural movement can damage interior assemblies—and draw specialty contractors into investigation

By Tanja Kern, Strategic Content Editor
skyscraper
Photo courtesy of FDNY X account (formerly Twitter).
July 13, 2026
Key Takeaways
  • Structural movement can damage nonstructural wall and ceiling assemblies, even when they aren't the cause.
  • Visible cracks and buckling require investigation, not assumptions about the source.
  • Stop work, document conditions, and obtain written direction before making repairs.

A structural emergency at one of New York City's largest adaptive reuse projects carries a hard lesson for wall and ceiling contractors: when a building moves, so do the assemblies attached to it. Nonstructural systems can be damaged or rendered unsafe, and their installers can be drawn into the investigation even when the fault lies elsewhere.

The office-to-residential conversion of the former Pfizer headquarters is expected to create more than 1,600 apartments across the adjoining buildings at 219 and 235 E. 42nd St.

On July 7, workers evacuated the 37-story tower at 235 E. 42nd St. after discovering two buckled structural columns on the 21st floor. According to an official briefing from New York City officials, responders also found multiple cracks and sagging floors and observed continued movement in one of the compromised columns. No injuries were reported.

Emergency crews subsequently installed temporary shoring and structural supports. After crews stabilized the affected portion of the building, officials reported that no additional movement had been detected and most surrounding streets reopened, according to the Associated Press.

However, some restrictions remained. As of July 13, NYC311 listed four neighboring buildings under full emergency evacuation orders, while a ground-floor restaurant in a fifth building remained under a partial evacuation order. Portions of East 43rd Street and the sidewalk along East 42nd Street also remained closed.

The New York City Department of Buildings is reviewing the approved plans, construction sequence and work performed at the property. The Wall Street Journal reported that the city Department of Investigation had opened an inquiry into the incident.

The Independent also reported that the Manhattan District Attorney’s Office and the Department of Investigation were conducting a preliminary criminal investigation. Neither agency has publicly detailed the inquiry, and no charges have been announced.

The cause of the column failure has not been officially determined.

When ‘Nonstructural’ Systems Become Involved

For wall and ceiling contractors, the incident illustrates how movement in the primary structure can affect cold-formed steel framing, drywall partitions, ceilings, firestopping, cladding attachments and other assemblies.

Dr. Kent Harries, FASCE, FACI, FIIFC, P.Eng., professor of structural engineering in the University of Pittsburgh’s Department of Civil and Environmental Engineering, said a typical cold-formed steel partition is not designed to carry the building’s structural loads.

Buckling in a non-load-bearing cold-formed steel partition generally results from the partition attempting to accommodate deflection in the load-bearing structure, Harries said.

That distinction is important. A buckled partition may be one of the most visible signs of distress without being the source of the problem.

Harries cautioned that components commonly described as nonstructural are not necessarily isolated from movement in the primary structure. Unless they have been intentionally detailed to accommodate that movement—an approach more commonly associated with seismic engineering—they may resist some of the forces created when the structural framing deflects or changes shape.

Because these elements are relatively less stiff and have low capacity, Harries said they will typically “go along for the ride.”

“If a ceiling sags, the walls beneath that ceiling will shorten accordingly,” he said, noting that photographs from the Manhattan incident appeared to show a buckled cold-formed steel partition wall.

Structural additions or removals can alter loads, change deflections and redistribute forces through an existing building, Harries said. Those changes can affect adjacent wall, ceiling and envelope assemblies.

That observation does not establish what caused the failure at the former Pfizer building, which remains under investigation. It does demonstrate why contractors should not automatically dismiss cracks, displaced ceilings, buckled studs or façade movement as isolated finish problems.

Harries said each of those symptoms of distress requires investigation to determine its source. The source could be excessive displacement or deflection of the supporting structure, or the redistribution of loads into elements typically considered nonstructural.

Separating cause from effect can be difficult, he said, and properly interpreting the distress requires experience and an accurate understanding of the structure.

Stop, Notify and Document

Specialty contractors can quickly become part of a dispute following structural distress, even when the originating condition falls outside their scope, according to Trent Cotney, partner and construction team leader at Adams and Reese LLP.

“It is common,” Cotney said. “Once there is visible movement or distress, everyone whose work is affected can get pulled into the dispute.”

Cracked drywall, displaced firestopping, moving ceilings and damaged cladding may represent symptoms rather than causes. The subcontractor’s first priority should be safety—not attempting to diagnose the structural problem or immediately repairing the visible damage.

“If there is cracking, movement, deflection or another condition that may be unsafe, the contractor should stop work in the affected area, notify the GC and owner in writing, and request direction,” Cotney said.

Contractors should preserve photographs, reports, RFIs and daily reports documenting what changed, when it changed and why the condition appears to fall outside their scope.

The timing of those records may become particularly important. Documentation should establish when the contractor first observed the condition, who was notified and what instructions were received.

“Continuing to work without written direction can create unnecessary liability,” Cotney said.

Contractors should also avoid performing permanent corrective work without written authorization unless immediate action is necessary to address a safety issue. Preserving the existing condition may help investigators and project participants determine what changed and when.

When structural movement damages installed walls, ceilings, firestopping or exterior assemblies, payment responsibility generally depends on the contract and the eventual determination of cause.

“If the subcontractor did not cause the movement, it should seek a change order for inspection, removal, repair and delay impacts,” Cotney said.

The work may need to proceed before the parties have resolved responsibility. In those situations, Cotney said contractors should reserve their contractual rights and avoid performing corrective work without written authorization unless an immediate safety issue requires action.

Harries said temporary works should be signed off by an appropriate design professional before remedial or general work resumes. The shoring should also be closely monitored.

This article was originally posted on www.wconline.com.
KEYWORDS: Adams & Reese adaptive reuse contractors legal issues in AEC New York renovation structural engineering tall buildings

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Epub tanja kern webp

Tanja Kern is strategic content editor at Roofing Contractor, its affiliated brands and Walls & Ceilings. She can be reached at kernt@bnpmedia.com and (417) 818-4429. She comes from an extensive history at BNP MEDIA with her hard work at the company’s food brands.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • pexels-suparerg-suksai-1030320.jpg

    Westlake Royal Releases Resources for Contractors Rebuilding After Hurricane

    See More
  • sustainable adhesives

    The Sustainable Season of Roofing Adhesives for Contractors

    See More
  • Distributors Can Be A Valuable Resource for Contractors

    See More

Related Products

See More Products
  • bim-3e.jpg

    BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd Edition

  • 9780128207918.jpg

    Eco-efficient Materials for Reducing Cooling Needs in Buildings and Construction 1st Edition

  • net zero.jpg

    Net Zero Energy Design: A Guide for Commercial Architecture

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing