Over 9,000 square feet of Kingspan’s insulated metal panels (IMPs) were selected by the architect KPA Group for the project
April 10, 2026
The new facility, just under 18,000 square feet, brings together multiple aircraft rescue and firefighting bays, a state-of-the-art general aviation terminal, and administration offices for the Contra Costa County Public Works Airports Division.
University of Arkansas’ Fine Arts Center reopens with renewed connectivity, preserved design integrity, and enhanced performance for contemporary arts education.
April 8, 2026
Preserving one of the few remaining mid-century modern structures on a prominent college campus, MBL Architecture (MBL) announced the completion of work at University of Arkansas’ renowned Fine Arts Center.
To strike the right blend of modernism and historical preservation, the architects thoughtfully designed four different window types
April 6, 2026
In searching for the perfect combination of building materials and styles to create a striking façade while honoring the district’s storied past, the design team tested countless samples and building mockups, and constructed full-scale, two-story brick façades.
The Painted Desert Community Complex at the Petrified Forest National Park in Arizona
April 3, 2026
Designed to operate as a net-zero energy facility, the revitalized complex integrates significant enclosure improvements and comprehensive mechanical system upgrades, informed by a data-driven process that employed advanced diagnostic tools, material analysis, and energy and daylight modeling.
Kingspan’s insulated metal panels (IMPs) were selected by Industrial Refrigeration & Design, Inc. as the building envelope to deliver the high level of thermal performance required for freezer and cooler applications.
Rebuking historic approaches to mental health and addictions care, the Mental Health and Addictions Centre in St. John’s, NL prioritizes dignity, accessibility, and community
March 18, 2026
With exterior and interior architecture by B+H in partnership with John Hearn Architects, MHAC is designed to reduce stigma, centre the patient experience, improve access to services, and integrate patient families and communities into care.
The new design provides equitable access to daylight and views throughout the building and eliminates the old “book bunker” feel of mid-century libraries
March 13, 2026
Once a dark, windowless space for patrons, the University of Pittsburgh’s Hillman Library has been transformed into a bright, inviting place of collaboration, learning and discovery.
Matanzas High School new central energy plant has already earned a $220,000 energy rebate to offset district costs
March 9, 2026
Matern Professional Engineering and the Flagler Schools announced the successful modernization of the central energy plant at Flagler Palm Coast High School, with upgrades to Matanzas High School, another high school within Flagler Schools, currently underway.
Miller Hull’s mass timber building offers flexible environments, sustainable strategies, and a welcoming civic presence for all
February 18, 2026
Designed by The Miller Hull Partnership with local firm Steele Associates, in collaboration with Deschutes Public Library (DPL), the two-story, mass timber building more than doubles the size of the previous library and reimagines it as a vibrant, flexible, and inclusive civic space.
The project features 261,635 square feet of QuadCore Optimo panels, alongside 7,793 square feet of QuadCore KS Micro Rib panels.
February 16, 2026
The architectural design of the facility, led by Page Southerland Page, required a building envelope solution that would meet the rigorous energy demands of semiconductor manufacturing while reflecting the modern, high-tech nature of the facility.