Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Project Profiles

Reducing Energy Costs Through Central Energy Plant Modernization at Two High Schools

Matanzas High School new central energy plant has already earned a $220,000 energy rebate to offset district costs

Matanzas High School exterior
Chuck Coates
March 9, 2026

Matern Professional Engineering, a multi-disciplined building systems and commissioning engineering firm, and the Flagler Schools announced the successful modernization of the central energy plant at Flagler Palm Coast High School, with upgrades to Matanzas High School, another high school within Flagler Schools, currently underway. The projects represent a strategic, system-wide approach to reducing operational costs across the district.

The central energy plant at Flagler Palm Coast High School came online in December 2025 and is projected to save the district over 213,000 kilowatt-hours (KWH) annually. The project has earned the district an energy rebate of $293,000 to offset district costs and accelerate the return on investment, which is estimated at under five years when coupled with these rebates. An additional rebate is anticipated through the installation of thermal storage technology at the campus, with further savings possible under the Clean Electricity Investment Tax Credit – 26 U.S. Code §48E.

The upgrades at Matanzas High School have been more complex, coinciding with another major project on the campus. Construction completion is set for Spring 2027. By reusing and elevating existing infrastructure at Flagler Palm Coast High School and expanding the plant at Matanzas, the district saved more than $1 million in construction costs. 

Rather than pursuing piecemeal fixes, Matern and Flagler Schools took a system-wide approach, conducting assessments and feasibility studies to identify the most economical, maintenance-friendly solutions for these campuses. Through value engineering exercises, the project teams adjusted their approach to address budget constraints, including the impacts of tariffs and COVID-era cost escalations, without sacrificing quality or design intent.

The initiative was led by Kory Bush, Director of Plant Services at Flagler Schools; Mike Metz, Supervisor of Plant Services at Flagler Schools; Brett Galt, Project Manager of Plant Services at Flagler Schools; Ryan Strandquest, LEED AP, President of Matern Professional Engineering; and Daniel Mahler, PE, Mechanical Engineer at Matern. Their combined expertise in HVAC modernization, energy optimization, and rebate strategy ensured both improved performance and financial responsibility for the district.

"Matern has always understood our pain points when it comes to budget," said Bush. "From the onset, Ryan took the time to explain our options, lay out the pros and cons, and roll back the technical language so we could easily understand and make informed decisions together. It was clear he cared about our student body, administration, and our community. As stewards of taxpayer money, we needed a partner who could help us find the most economical path forward, and Matern delivered."

"Public school districts across Florida are facing the same challenge: aging infrastructure, rising energy costs, and limited budgets," said Strandquest. "What we accomplished with Flagler Schools proves that with the right collaboration and a strategic approach to rebate programs and energy optimization, districts can make transformative improvements without breaking the budget. If district engineers are not informing and taking advantage of programs like the Inflation Reduction Act, they are leaving significant value on the table. We have to find ways to think more like a business to create better learning environments for the current student body, faculty, and future generations."

Flagler School’s thermal storage system optimizes energy usage by generating cooling capacity during off-peak hours at lower rate structures, resulting in meaningful cost savings for taxpayers. While not classified as a traditional sustainability measure, the approach delivers real financial returns and reduced energy demand during peak periods.

The collaboration between Matern and Flagler Schools is positioned as a model for how Florida school districts can leverage HVAC infrastructure to reduce energy costs, capitalize on available rebate programs, and demonstrate responsible use of public funds.

KEYWORDS: academic building energy efficiency engineering engineering firms Florida HVAC infrastructure taxes

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • A high school campus

    Energy Costs are Driving Efficient Designs to Approach Net Zero for Schools

    See More
  • residential house has white exterior walls and terra cotta

    On-Demand Webinar Explores How Concrete Tile Roofing Reduces Energy Costs and Supports Solar Integration

    See More
  • Kentucky Architectural Firm Building Better, Healthier, High-Performance Schools

    See More

Related Products

See More Products
  • energy modeling.jpg

    Energy Modeling and Computations in the Building Envelope

  • net zero.jpg

    Net Zero Energy Design: A Guide for Commercial Architecture

  • 9780128207918.jpg

    Eco-efficient Materials for Reducing Cooling Needs in Buildings and Construction 1st Edition

See More Products

Events

View AllSubmit An Event
  • June 25, 2026

    Reducing Occupant Energy Costs

    Credits: 1 AIA LU/HSW pending; 1 IIBEC CEH; 0.1 ICC CEU On-Demand This presentation examines the role of concrete tile roof systems as a high performing component of the building enclosure, with a specific focus on energy performance and solar compatibility. While roofing discussions often center on aesthetics or installation, this session shifts the focus to how roof system design influences heat transfer, peak energy demand, and long-term operational costs. 
  • April 30, 2026

    Where Energy Efficiency Meets Life Safety: Polyiso CI and the Critical Role of NFPA 285

    Credits: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU On-Demand This presentation delivers a comprehensive look at the performance advantages of continuous insulation, with a special focus on polyisocyanurate (polyiso CI) solutions.
View AllSubmit An Event
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing