As the AIA 2030 Commitment moves to reposition itself over the coming years, it will also come into stronger alignment with AIA's Strategic Plan 2026–2030, which acknowledges within the four interconnected "PACE" goals
Energy efficiency benchmarking alone is no longer sufficient and we recommend evolving the American Institute of Architects' (AIA) primary climate action program to track total carbon intensity by incorporating fuel source reporting, electrification metrics, expanded embodied carbon tracking, and updated baselines.
Where High-Performance Durability Meets Artistic Visions
April 29, 2026
After forty years, moisture and water infiltration had compromised the facade, and the Anchorage School District wanted a high-performance solution capable of withstanding the rigors of the Alaskan climate.
Some of factors Benjamin Obdyke is seeing have an influence on the design and construction of multifamily building envelopes this year—and how to navigate changes
April 27, 2026
Some of factors Benjamin Obdyke is seeing have an influence on the design and construction of multifamily building envelopes this year—and how to navigate changes
Erected in 1928 as the Mecklenburg County Courthouse, this historic building now serves as the Mecklenburg County District Attorney’s Office and remains one of Charlotte’s most recognizable civic landmarks
April 24, 2026
When leaks began appearing across several roof sections of the Mecklenburg County District Attorney’s Office, each constructed from different materials during past renovations, the Mecklenburg County Asset and Facility Management Department sought a solution that could preserve the structure’s integrity.
The state of the future construction workforce will be determined by steps taken today. Its success will rely on involvement at all levels – from new grads entering a workforce with native AI experience to AI pros equipped with critical technical expertise to seasoned professionals with 30+ years of industry experience under their belt.
Purpose-built unit for maternal and fetal health brings consultation, delivery, and surgical care under one roof, integrated with hospitality-driven design features
April 20, 2026
Perkins&Will’s Philadelphia studio has unveiled their design for the new Advanced Delivery Unit (ADU) at Nemours Children’s Hospital
This article explores the significant design, engineering, and long-term performance benefits of an integrated rainscreen system compared to a non-integrated component assembly.
In addition to assisting with the building’s tilt-up wall design, Case’s scope also included engineering the facility’s steel framing and foundation
April 15, 2026
Case Engineering partnered with St. Charles, MO-based Knapp Engineering, LLC on the structural engineering and tilt-up design for the new $10 million Teklab environmental testing laboratory in Collinsville, IL.