Some of factors Benjamin Obdyke is seeing have an influence on the design and construction of multifamily building envelopes this year—and how to navigate changes
April 27, 2026
Some of factors Benjamin Obdyke is seeing have an influence on the design and construction of multifamily building envelopes this year—and how to navigate changes
Erected in 1928 as the Mecklenburg County Courthouse, this historic building now serves as the Mecklenburg County District Attorney’s Office and remains one of Charlotte’s most recognizable civic landmarks
April 24, 2026
When leaks began appearing across several roof sections of the Mecklenburg County District Attorney’s Office, each constructed from different materials during past renovations, the Mecklenburg County Asset and Facility Management Department sought a solution that could preserve the structure’s integrity.
The state of the future construction workforce will be determined by steps taken today. Its success will rely on involvement at all levels – from new grads entering a workforce with native AI experience to AI pros equipped with critical technical expertise to seasoned professionals with 30+ years of industry experience under their belt.
Purpose-built unit for maternal and fetal health brings consultation, delivery, and surgical care under one roof, integrated with hospitality-driven design features
April 20, 2026
Perkins&Will’s Philadelphia studio has unveiled their design for the new Advanced Delivery Unit (ADU) at Nemours Children’s Hospital
This article explores the significant design, engineering, and long-term performance benefits of an integrated rainscreen system compared to a non-integrated component assembly.
In addition to assisting with the building’s tilt-up wall design, Case’s scope also included engineering the facility’s steel framing and foundation
April 15, 2026
Case Engineering partnered with St. Charles, MO-based Knapp Engineering, LLC on the structural engineering and tilt-up design for the new $10 million Teklab environmental testing laboratory in Collinsville, IL.
Over 9,000 square feet of Kingspan’s insulated metal panels (IMPs) were selected by the architect KPA Group for the project
April 10, 2026
The new facility, just under 18,000 square feet, brings together multiple aircraft rescue and firefighting bays, a state-of-the-art general aviation terminal, and administration offices for the Contra Costa County Public Works Airports Division.
University of Arkansas’ Fine Arts Center reopens with renewed connectivity, preserved design integrity, and enhanced performance for contemporary arts education.
April 8, 2026
Preserving one of the few remaining mid-century modern structures on a prominent college campus, MBL Architecture (MBL) announced the completion of work at University of Arkansas’ renowned Fine Arts Center.
To strike the right blend of modernism and historical preservation, the architects thoughtfully designed four different window types
April 6, 2026
In searching for the perfect combination of building materials and styles to create a striking façade while honoring the district’s storied past, the design team tested countless samples and building mockups, and constructed full-scale, two-story brick façades.