Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Home » HVAC

Articles Tagged with ''HVAC''

U.S. Consulate General Mérida, Mexico exterior

The U.S. Department of Stateʼs New Consulate General Mérida

Miller Hullʼs design achieves LEED Gold Certification while drawing on Maya influences
June 19, 2026

Designed by The Miller Hull Partnership, the new U.S. Consulate General Mérida achieved LEED Gold Certification in April 2026, exceeding stringent federal performance goals while serving the needs of American citizens and visa applicants from across Mexicoʼs Yucatán peninsula.


Read More
Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Completed in 2024, the single-story, 2,400-square-foot facility provides a flexible environment where students can explore books, collaborate and participate in group instruction
May 11, 2026

As part of a $90 million district-wide infrastructure improvement bond, Carpinteria Unified School District planned a new modular learning center and library for the shared campus of Canalino Elementary School and Canalino Family School.


Read More
Matanzas High School exterior

Reducing Energy Costs Through Central Energy Plant Modernization at Two High Schools

Matanzas High School new central energy plant has already earned a $220,000 energy rebate to offset district costs
March 9, 2026

Matern Professional Engineering and the Flagler Schools announced the successful modernization of the central energy plant at Flagler Palm Coast High School, with upgrades to Matanzas High School, another high school within Flagler Schools, currently underway.


Read More
A completed high-performance enclosure (Gerhardt Apartments, St. Louis). sun sets in the background

A Forensic Approach to TPO Surface Oxidation and Long-Term Integrity

The Weld Window
Brandi Van Wambeke headshot
Brandi Van Wambeke
March 4, 2026

For building enclosure professionals and long-term asset managers, there is an invisible, ticking liability clock known as the "Weld Window".


Read More
MBC BioLabs at 1030 Brittan

MBH Architects Completes BioLabs Facility in San Carlos

The three-story facility with basement opened in April 2025 and marks the newest and largest addition to the growing San Carlos campus
February 20, 2026

MBH Architects announced the completion of MBC BioLabs at 1030 Brittan Avenue, a 152,660-square-foot incubator laboratory and office building in the heart of the Bay Area’s life science corridor.


Read More
Worthington Enterprises logo

Worthington Enterprises Agrees to Acquire Leading Metal Roof Components Manufacturer LSI Group

Worthington Enterprises plans to purchase LSI Group for approximately $205 million with cash on hand and borrowings under the company’s revolving credit facility
December 30, 2025

Worthington Enterprises Inc., a designer and manufacturer of market-leading brands that improve everyday life by elevating spaces and experiences, announced it has signed a definitive agreement to acquire LSI Group, LLC of Logansport, Ind.


Read More
pro looking at HVAC unit

The Role of Certified HVAC Filtration in Achieving Healthy Indoor Air in Sealed Buildings

When Smoke Gets In
Dr. Anna O'Donovan
December 24, 2025

A Certified Asthma & Allergy Friendly HVAC filter, tested to rigorous scientific standards, provides a validated approach to capturing airborne allergens and fine particles, helping maintain cleaner indoor air even when outdoor conditions are challenging.


Read More
 Cheer Office Building

MBL Architecture Completes Walmart’s Home Office

National design firm upgrades retail icon’s global headquarters with new master plan, Sam Walton Hall, 8th & Plate food hall, and other office facilities
December 2, 2025

MBL Architecture (MBL) announced the completion of work on Walmart’s global headquarters in Bentonville, Ark., including the campus’s newly constructed master plan, 8th & Plate food hall and the world-class destination, Sam Walton Hall.


Read More
graphic shows a white outline of a stopwatch on a yellow background

Is Building Envelope Commissioning Required in LEED v5?

What does LEED v5 BD+C actually say about BECx and fundamental commissioning?
daniel overbey
Daniel Overbey
October 27, 2025

Under the LEED v5 BD+C prerequisite EAp3 Fundamental Commissioning, there are five specific requirements regarding building envelop commissioning.


Read More
Roofing with the ocean in the background

How Prepared Is Your Building for Extreme Weather?

Severe weather events are on the rise throughout North America, posing a threat to the operational security of any building. Learn how high-performance roof systems can better protect your operations from costly weather damage
Tanner Duer headshot
Tanner Duer
October 10, 2025

Severe weather events are on the rise throughout North America, posing a threat to the operational security of any building. Learn how high-performance roof systems can better protect your operations from costly weather damage.


Read More
Previous 1 2 3 4 Next
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing