The exterior of the 38,000-square-foot building is defined by uniquely intersecting metal roof and wall panels that capture the creative spirit of the Shakespearean theater
The construction industry can increase productivity and quality while reducing energy consumption, lowering costs and saving time through creating strong links between designing and making
Phase one of a three-phase construction plan consisted of constructing three new cypress-clad, single-story classroom buildings, plus a reroof of an existing library building
A German company recently completed a unique steel and glass roofing project at the Gateway Arch National Park and Gateway Arch National Monument – part of a $380 million park revitalization.
Three new stations in the Toronto Transit Commission Line 1 Extension employed inverted roof membrane assemblies to achieve cool roof and longevity requirements.
The project includes a 30,000-square foot main building, a gym, outdoor sports fields, a teen center, learning centers, a technology and STEM lab, art and music spaces, and a kitchen.