Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Metal Roofing Materials

Challenges with Metal Roof Solved at Alabama School

Indian Springs School
Indian Springs School 2
Indian Springs School
Indian Springs School 2
August 15, 2018

When founded in 1952, the master plan for Indian Springs School in Birmingham, Ala., called for campus development to maintain focus on the lake at the center of the school’s wooded 350-acre property. During the past 30 years, however, focus was lost, so a new plan was made to demolish then construct buildings that re-establish a connection to the lake. The school enrolls 280 students in grades 8-12.
 
Phase one of a three-phase construction plan consisted of constructing three new cypress-clad, single-story classroom buildings and a new administration building, plus a reroof of an existing library building. Oversight of design and construction was handled through a partnership of Lake Flato Architects in San Antonio and ArchitectureWorks in Birmingham.
 
The first phase utilized 45,000 sq. ft. of Petersen’s 18-in. wide 24-gauge Snap-Clad and Tite-Loc roof panels in Cool Color Zinc. The new buildings, which added 18 classrooms and 18 administrative offices, achieved LEED Silver status.
 
Installation of the PAC-CLAD roof was completed by Quality Architectural Metal and Roofing in Birmingham. The combination of Snap-Clad and Tite-Loc was explained by Eddie Still, vice president and project manager. “We used the mechanically seamed Tite-Loc panel on a few areas with pitches that required that profile, which amounted to less than 2,000 square feet.”
 
Some of the buildings feature monitors, which provide daylighting to each classroom, onto which QAMR installed PAC-CLAD flush panels for both the vertical and horizontal sections.
 
This was a big job, Still said. “Installation went smoothly, but finding manpower to get it done was the problem. The job was big with multiple buildings, and I wasn’t able to stop all of our other projects for this one job. So we approached it like four small jobs. This sounded good in theory but there were delays with the work in front of us which impacted my schedule. This meant I had to put two crews out there to catch up. And then I had to call one of my friendly competitors and put one of his crews out there to help out. I’ve never done that before but it worked out. Plus, these architects were good to work with. We had no issues at all on this project. We worked smoothly together.”
 
Still said he frequently uses Petersen’s Snap-Clad panel. “The panel performs well and we’ve never had problems with it. You don’t need to reinvent the wheel, you just need a product you can depend on. We have a 30-plus year relationship with Petersen and they’re great to do business with,” Still said.
 
ArchitectureWorks, which was first to join the project and managed the construction portion, formed a partnership with Lake Flato because of its focus on school design. “In general terms Lake Flato was the design architect doing the master planning, and ArchitectureWorks was the architect of record, or executive architect, that completed construction documents and oversaw the construction phase,” said Greg Papay, FAIA and partner at Lake Flato. “We get asked to team up on jobs all the time, but they don’t all go as smoothly as this one did. ArchitectureWorks was great to work with.”
 
The design team sought to respect the school’s original structures’ simple forms and materials while opening the new buildings to nature. “Our notion was that 21st century schools could actually feel more like 19th century schools,” Papay explained, referring to the firm’s back-to-basics approach.
 
All new buildings feature a roof that extends over covered walkways, Papay explained. “The roof shape allowed us to create transition spaces around each building that blur the lines between indoor and outdoor areas. We chose a metal roof for longevity, attractiveness and efficiency properties. Plus, Birmingham used to be the steel capital of the South, so to have it on the buildings was a subtle reference to that local history,” he said.
 
Because of the school’s Southern U.S. location, “It was important to find balance between heat gain and glare inside from reflectivity off a neighboring roof, so we had to find the right color that addressed those issues. In the end we chose PAC-CLAD’s Cool Color Zinc.”
 
Lake Flato’s approach to building materials is to allow each to express its nature, where steel and wood in this application remain light in appearance. “We want a metal roof to look thin at the edge, so we don’t use heavy fascia. Some people wrap roof edges with fascia and don’t care if its appearance is thick or heavy, but fascia is not part of our approach; we were mindful of the details,” Papay said.
 
Papay added that these buildings have subtle geometry shifts to accommodate natural rock groupings on the land. Therefore, “there was some roof detailing required where it was not turning at 90 degrees with a simple ridge/valley, so there was some metalworking trickery required at that point. Also we created roof monitors which are smaller elements that required refined metal work. The roof looks great thanks to a great installation job,” Papay said.
 
General contractor on the project was BL Harbert International in Birmingham.

KEYWORDS: metal roofing

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • PAC-CLAD-PineIslandAcademy_NocateeFL_HPI0042-MHorton-scaled.jpg

    School Joins Fast-Growing District With Stand-Out Metal Roof

    See More
  • HealthPark

    Modern Design Created with Metal Wall, Roof Cladding

    See More
  • Bandwidth Inc. Headquarters exterior

    Corporate Campus Adds Rural Appeal with Standing-Seam Metal Roof

    See More
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing