Every year, new Topgolf venues open across North America and beyond. Supporting this consistent growth, ARCO/Murray Construction Company has provided design/build services for U.S. Topgolf locations since 2006
From initial construction to eventual renovation or replacement, every building uses energy, water, and raw materials while generating waste and atmospheric emissions throughout its life cycle
For five years, GCP Applied Technologies has partnered with the Weitz Construction Academy at Seminole Ridge High School in Loxahatchee, Fla. to provide needed products and educate their students
As the building design and construction industry adopts a more holistic and comprehensive approach to assessing materials and resources for environmental impact, interest in life-cycle assessments has risen and the market has become saturated with transparency documentation such as EPDs.
This course will explain the importance of each of these questions and offer actionable insights into roof system design that can maximize solar output and provide long-term performance of the roof system that can outlast the life expectancy of the PV arrays.