Now reimagined, the original seven-story, U-shaped building has been filled in and expanded to 150,000 square feet of office and restaurant space capped by two new floors
January 21, 2026
Reviving the century-old Maple Terrace Apartments in Dallas, 5G Studio’s adaptive reuse of the historic landmark features glass from Vitro Architectural Glass on the building’s new windows and two-story curtain wall addition.
A central part of Colgate’s guiding Third-Century Plan, Olin Hall’s latest renovation and expansion strengthens collaborative learning and the student campus experience while preserving its role as the historic academic heart of campus
January 16, 2026
Olin Hall, Colgate University’s largest academic building, has been transformed into a state-of-the-art interdisciplinary facility, offering an upgraded and expanded learning environment for the university’s new and existing science programming.
The revitalized building upgrades seismic and life safety performance, and is a welcoming, inclusive, and accessible new Center for the University’s Disabled Students’ Program
January 14, 2026
The renovation of the Creekside Center provides a new, more welcoming centralized home for disabled student services on campus and consolidates DSP staff, allowing for improved and expanded services for more than 4,000 students.
Features Tubelite curtain wall and entrances finished by Linetec, plus Viracon glass and thermal spacer
January 12, 2026
After a comprehensive renovation, the Marshall N. White Community Center, a two-story, 68,000-square-foot building honors its namesake’s legacy and offers a vibrant hub with a wide range of recreational, educational and social programs for all ages.
Giddens School & Lake Washington Girls Middle School
January 9, 2026
The Giddens School and Lake Washington Girls Middle School complex is an urban educational campus located between Beacon Hill and the Central District neighborhoods of Seattle, and designed to host two private, independent schools.
Wells Fargo has opened the largest net-positive corporate campus ever built in the U.S. The innovative campus employs cutting edge sustainable design. Varun Kohli, Principal and Director of Sustainability at Corgan and Matt McDonald, Principal and Office Sector Leader at Corgan join us to discuss this project.
Both ASHRAE 90.1-2022 and the 2024 IECC are published and available for adoption. Adoption will vary by region, but the direction is clear: expectations for tighter, more resilient building envelopes continue to rise as more municipalities move toward these standards into 2026.
The 166-unit, five-story building features a series of outdoor courtyards that invite fresh air, natural light, and greenery into each unit, ensuring residents are able to enjoy views and connections to nature.
Information suggests that LEED v6 would likely rollout in early 2030, serve as the current version from 2030 through 2035, and ultimately sunset around 2041
The latest version of the LEED rating system, LEED v5, is open for business. Registration is open, the Credit Library the Reference Guides are published, and a new version of Arc has replaced the old LEED Online platform.