Designed during the period when the relationship between the police and the communities they serve was at the forefront of national conversation, Leers Weinzapfel Associates’ $25M, 27,500 square-foot East Boston Police Station opened on January 1, 2023.
Capping off this world-class array of amenities, guests and residents will also find a sanctuary on the 4th floor, which features an exclusive state-of-the-art gym, Raffles Spa and 20-meter indoor pool with expansive city views.
The U.S. Green Building Council, Green Business Certification Inc. and the International WELL Building Institute announced a streamlined process for projects pursuing certifications for the LEED green building rating system and the WELL Building Standard.
Australia-based Ecofibre recognized an opportunity to expand its emerging U.S. operations to meet the growing demand for the natural and medicinal properties of industrial hemp. In order to do so, a new, sustainable, multi-purpose North American headquarters was essential.
Duro-Last’s systems will complement and strengthen Holcim’s integrated roofing offer, with expected synergies of USD 60 million per year. With this acquisition, Holcim roofing systems will exceed USD 4 billion in net sales ahead of schedule.
Serving as an important bridge between the low-rise, pedestrian-scaled Deep Ellum historic neighborhood and Dallas’ downtown high-rises, the new Epic I office building is creatively stacked in two to five-story blocks to mediate the two urban scales.
Designing a building such that its interiors may allow for passive survivability and the ability for occupants to shelter in place during an extreme temperature event can be assessed using the standard effective temperature (SET) metric.
The project, which is expected to continue through 2025, includes the removal and replacement of the original 35-year-old sealants on the entire 588-foot-tall building’s curtain wall and bridge.
Project teams are considering additional dimensions of carbon emissions resulting from a building project, including carbon emissions from water consumption, waste generation, occupant transportation, and the embodied carbon of materials used to build the project.
With increasing evidence of a shifting climate, many building project teams are confronting the compounded threat of increasingly severe heat waves and the vulnerability of our country's electrical grid.