Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Breaking News

Augmenta Raises US$11.75 Million in Seed Extension to Disrupt the Construction Industry Through Automated Building Design

2.jpg
June 21, 2023

Augmenta, the company automating building design for the construction industry, today announced it has raised US$11.75 million in a seed extension round that will be used to commercialize the company’s groundbreaking design platform for the construction industry. The investment was led by Eclipse with participation from Hazelview Ventures, BDC Capital’s Deep Tech Venture Fund, and Suffolk Technologies. The investment brings Augmenta’s total funds raised to date to US$15.85 million.

With the funds raised in this seed extension, Augmenta plans to double its team over the next nine months across engineering, sales, and support. Augmenta will also use the investment to build on the momentum that the company has achieved to date. This includes implementing commercial pilots with several electrical engineering firms that are currently participating in Augmenta’s formalized feedback program.    

Augmenta is on track to commercialize the Electrical System Design (ESD) module of its groundbreaking Augmenta Construction Platform (ACP) in Q1 2024. The ESD module generates fully constructible, code-compliant designs of electrical raceway routing for electrical engineers and contractors. The company is also planning to expand into adjacent markets with the development of plumbing and mechanical modules. 

 

Augmenta solving a critical problem in the construction industry

In the construction industry today, legacy tools and processes used for designing complex building systems like electrical, plumbing, and HVAC make it extremely difficult and time consuming to ensure designs are feasible for construction. Time and resource pressures lead to errors that require significant rework, slowing down both design and construction, and substantially increasing risk, uncertainty, and costs for contractors and engineers – and in turn real estate developers and owners.

At a time when the industry continues to face talent and material shortages, pressure mounts due to the inherent complexity of building design. Augmenta is providing innovative new technology to solve these challenges. Through its technology platform, Augmenta automates the entire design process for contractors and engineers, ensuring the designs they create are error-free, constructible, and optimized according to client needs. These designs are created in minutes to hours instead of weeks to months.

“Our vision is to completely disrupt an element of the construction industry that has remained largely unchanged for decades,” said Francesco Iorio, CEO of Augmenta. “Building on the success of the ESD beta program that is currently underway, we are very well positioned to scale these initial tests as pilots and begin generating revenue as we prepare for our expansion into adjacent markets.”

Augmenta was recently recognized as a Top 50 Preconstruction Future Disruptor by BuiltWorlds, in addition to receiving a strong level of interest from the industry at large through its Augmenta Feedback Community. The Augmenta Feedback Community gives strategic industry partners, as well as forward thinking engineering firms and contractors, access to early builds of Augmenta’s software and the opportunity to guide its product development. Augmenta has a waitlist of almost 30 companies that have applied to participate in this beta program and will expand participation through the end of 2023.

“The construction industry has yet to reap the productivity, scalability, and sustainability benefits of advanced technology other industries have been transformed by,” said Charly Mwangi, Partner at Eclipse. “Using generative AI coupled with a world-class technical team, Augmenta’s design platform will completely turn the construction industry on its head.” Concurrent with the investment in Augmenta, Mwangi will join the Augmenta Board of Directors.

“Since our initial investment in Augmenta last year, we remain confident that its construction platform is an industry changing technology,” said Roger Poirier, co-founder of Hazelview Ventures. “This follow-on investment further reinforces our commitment to the company, and we look forward to our continued work with Francesco and his incredible team.”

“Design is a significant area of opportunity for construction efficiency improvements,” said Wan Li Zhu, co-founder and Managing Director of Suffolk Technologies. “By investing in and partnering with Augmenta to apply breakthrough AI to assist skilled building designers and engineers, we will reduce costs and accelerate the delivery of construction projects across the industry.”

KEYWORDS: apps and software BIM (Building Information Modeling) building design engineering

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Seed-Raise-Banner.jpg

    Augmenta Raises US$4.1 Million in Seed Funding to Automate Building Design

    See More
  • BuiltWords.png

    BuiltWorlds and 1871 Partner to Drive Innovation Across the Construction Industry

    See More
  • evgeniy-surzhan-lVWozBOVY2M-unsplash.jpg

    The Future of Technology within the Construction Industry

    See More

Related Products

See More Products
  • ecology.jpg

    Architecture and Systems Ecology: Thermodynamic Principles of Environmental Building Design, in three parts

  • tall building.jpg

    Tall Building Design: Steel, Concrete, and Composite Systems

  • ninteeth century.jpg

    Sustainable Building Design: Learning from nineteenth-century innovations

See More Products

Events

View AllSubmit An Event
  • September 30, 2025

    Loss Mitigation Through Building Design

    Credits: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEUOn-Demand Through this course, learn about how specifying the roof edge is the single most cost-effective enhancement for wind uplift on a commercial roof and how you can help mitigate risk and protect lives through design.
View AllSubmit An Event
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing