Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Breaking News

Augmenta Raises US$4.1 Million in Seed Funding to Automate Building Design

Seed-Raise-Banner.jpg
June 21, 2022

Augmenta, the company automating building design for the construction industry, announced it has emerged from stealth mode with US$4.1 million in seed funding to bring to market its design platform for the construction industry. The round was led by Hazelview Ventures with participation from Ferguson Ventures and Whiteshell Group Inc. The funds will be used to accelerate the development of the Augmenta Construction Platform (ACP); launch a pilot program for the Electrical System Design (ESD) module – the first of several solutions that have been built on Augmenta’s automated design platform; and grow the Augmenta team across sales, deployment, and customer support. 

In the construction industry today, legacy tools and processes used for designing complex building systems like electrical, plumbing, and HVAC make it extremely difficult and time consuming to ensure designs are feasible for construction. Combined with time and resource pressures, this leads to errors that require significant rework, slowing down both design and construction and substantially increasing risk, uncertainty, and costs for contractors and engineers – and in turn real estate developers and owners. At a time when the industry faces talent and material shortages, and pressure mounts due to the inherent complexity of building design, Augmenta is providing innovative new technology to solve these challenges. Based on early customer trials, Augmenta is delivering enormous time and cost savings by bringing generative design to the construction industry. Through its technology platform, Augmenta is automating the entire design process for contractors and engineers, ensuring the designs they create are error-free, constructible, and optimized according to client needs, and created in hours instead of weeks.

Building designs produced using ACP are also sustainable. Since they are fully detailed, coordinated, and optimized, contractors can use less material in their designs, order only what they need, and significantly reduce wasteful errors and rework. Additionally, ACP optimizes building systems designs to ensure they use less energy and resources, thereby reducing environmental impact over the building’s life cycle.

“The construction industry continues to face major challenges due to manual design processes – and is ripe for disruption,” said Francesco Iorio, CEO and co-founder of Augmenta. “We are bringing a massive sea change to the industry by introducing technology that will make the transition from current manual design processes to generative design as fundamental as the shift from pen and paper to computers.”

Hazelview Ventures, a wholly owned subsidiary and venture arm of Hazelview Investments Inc., focuses exclusively on partnering with innovative, early-stage PropTech, BuildTech, and CleanTech companies. Along with the seed investment, Hazelview Ventures is a strategic partner that will be incorporating the Augmenta platform in construction projects. This partnership will enable Augmenta to test, refine, and scale its platform at an enterprise level and bring efficiencies to Hazelview’s design and construction processes. Hazelview Investments manages CAD$11.6 billion in real estate assets and has a $4 billion development pipeline.

“Augmenta’s technology is a huge step forward for the construction industry and will help stakeholders achieve both cost savings and ESG benefits through waste reduction,” said Roger Poirier, co-founder of Hazelview Ventures. “We are excited to be partnered with such a ground-breaking company.” Concurrent with the investment in Augmenta, Poirier will join the Augmenta board of directors.

“We support innovation in the construction industry and invest in startups that enable significant productivity advancements to help our customers build better,” said Blake Luse, Managing Director at Ferguson Ventures, the corporate venture capital arm of Ferguson. “Augmenta’s approach in bringing Generative Design to the construction industry will drive efficiencies and help solve business challenges that our contractor customers are facing today. Ultimately, our investment in Augmenta will help skilled trade workers be more efficient on the jobsite and deliver environmental value by helping to reduce construction waste due to less jobsite rework.” Ferguson is a leading North American value-added distributor that provides expertise, solutions, and building supplies to plumbing, fire, HVAC, fabrication, and other trade professionals. 

In preparation for the imminent launch of a pilot program for its first product – an automated design module for electrical engineers and contractors that generates fully constructible, code-compliant designs of electrical raceway routing – Augmenta has partnered with Interstates, an innovative electrical contractor based in the U.S. Interstates has helped co-design and test the electrical module over a period of several months in collaboration with Augmenta.

“In a very short period of time, we are seeing how dramatically Augmenta’s approach to automated design can reduce the cost of the design process,” said Josh Gillespie, BIM/VDC Director at Interstates. “It enables us to decrease the risk of inaccurately scoping time and cost estimates while drastically reducing the time it takes to complete estimates for bids. This gives us additional time to present fully considered design alternatives, thus positioning our company as a strategic partner to our clients, which include general contractors, engineering firms, developers, and owners.”

KEYWORDS: building design construction

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • 2.jpg

    Augmenta Raises US$11.75 Million in Seed Extension to Disrupt the Construction Industry Through Automated Building Design

    See More
  • 4.jpg

    National Science Foundation Awards Research Funding to Advance Performance-Based Fire Design for Cold-Formed Steel Structures

    See More
  • Landmarks Illinois logo

    Landmarks Illinois Provides Nearly $65,000 in Grant Funding to Support Illinois Preservation Projects

    See More

Related Products

See More Products
  • ecology.jpg

    Architecture and Systems Ecology: Thermodynamic Principles of Environmental Building Design, in three parts

  • tall building.jpg

    Tall Building Design: Steel, Concrete, and Composite Systems

  • ninteeth century.jpg

    Sustainable Building Design: Learning from nineteenth-century innovations

See More Products

Events

View AllSubmit An Event
  • September 30, 2025

    Loss Mitigation Through Building Design

    Credits: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEUOn-Demand Through this course, learn about how specifying the roof edge is the single most cost-effective enhancement for wind uplift on a commercial roof and how you can help mitigate risk and protect lives through design.
View AllSubmit An Event
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing