Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Home » Events » Failure Is Not an Option: Air Barrier Continuity Strategies for Storefront & Curtain Wall Systems

Refine your results by

Failure Is Not an Option: Air Barrier Continuity Strategies for Storefront & Curtain Wall Systems

KEYWORDS: building design / building standards / cladding / concrete / roofing / roofing contractors
3/21/24 11:00 am to 3/21/25 11:00 am EDT
Contact: Demi

Credits: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 IACET CEU

Critical details that typically cause building performance related issues will be focused on one of the largest failures of building enclosures: wall to window connections specific to curtain wall systems and storefronts. A step-by-step look at each critical detail in regards to sequence of construction and the various connections to ensure airtight/watertight and thermally protected details. Real life photos and job conditions will highlight the realities of the construction process to show typical errors found and how those errors can be addressed correctly.

Learning objectives: 

  1. Articulate how transitions impact building enclosure performance through real life experiences regarding energy loss, building performance and the sustainability of the system. 
  2. Correctly identify and prioritize critical details during the construction document phase to ensure an integrated approach is taken to heat, air, water and vapor control. 
  3. Assess each detail for storefront and curtain wall regarding impacts of the four control layers and understand the various options for designing details for a variety of roof, wall and window assemblies.
  4. Using real-life case studies and photos, plan out the proper sequence of construction and identify quality control methods in construction document review to provide corrective action.
     

Sponsored by: 



Register for this Event

Related Articles

Evaluating High Thermally Performing Hybrid Curtain Wall Systems

Steel Lays the Framework for Energy-Efficient Glass Curtain Wall Systems

FreMarq Innovations and Alpen Align to Expand Access to High-Performance Curtain Wall Systems

Seattle Convention Center’s New Building Features Thermal Barrier in High-Performance Curtain Wall

Related Products

Sustainable Renovation: Strategies for Commercial Building Systems and Envelope

Heating, Cooling, Lighting: Sustainable Design Strategies Towards Net Zero Architecture, 5th Edition

Integrating Building Performance with Design: An Architecture Student’s Guidebook

Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

skyscraper

NYC Tower Failure Offers Warning for Contractors

Building Enclosure Newsletter

BE Poll

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing