A discussion with RCI’s Executive Vice President and Chief Executive Officer, Lionel van der Walt, about trends and challenges he sees currently in the industry, and where he thinks the industry is going
In the building envelope, the time soaking process of applying a separate weather and air barrier is giving way to integrated sheathing — combining the sheathing and the WRB-AB together
The construction industry can increase productivity and quality while reducing energy consumption, lowering costs and saving time through creating strong links between designing and making
Three new stations in the Toronto Transit Commission Line 1 Extension employed inverted roof membrane assemblies to achieve cool roof and longevity requirements.
The project includes a 30,000-square foot main building, a gym, outdoor sports fields, a teen center, learning centers, a technology and STEM lab, art and music spaces, and a kitchen.