A new station opens up the department to the surrounding community, both visually and literally, thanks to its substantial meeting space. It also features a classic design highlighted by metal roof panels and wall highlights that will help ease maintenance for decades to come.
Browse our articles to read about topics such as reducing carbon in precast wall systems, achieving the proper airtightness of buildings, and how metal roofs are leading the way toward energy efficiency.
A new 290-unit apartment building called Parc Haven Apartments is one of the standout additions. It features industrial-style metal cladding that references the train tracks it adjoins, along with colorful metal panel highlights that nod to the park’s signature sculpture sited directly across the street.
Hurricanes devastated properties across the U.S. Virgin Islands a few years ago, including on St. Thomas where the former Bluebeard Beach Club resort lost the roofs on all seven of its guestroom buildings, which also all suffered significant moisture damage.
Creating mid-rise apartment buildings that are both affordable and attractive can be a challenge. Architects must balance the desire to add exterior flair without busting a client’s budget.
Completion of Boston’s newest eye-catching facility, including the installation of aluminum composite material took more than four years. Modernizing the facilities included the addition of four new gates, including three approved in 1995 but never built.
Inherent in their makeup, metal roofs are sustainable, durable, and last about three times longer than other roofs. They help to trap less heat and cool a building down quicker.
The new school, now open, features an exterior design that mixes traditional and contemporary materials – and which mirrors the forward-thinking educational programs happening within its walls.
The Wentzville School District has been the fastest-growing school district in Missouri for the past decade, averaging more than 600 new students a year. Demographic data indicates that the number of pre-kindergarten children is expected to increase in the district for at least the next 10 years.