Because time waits for no one, keeping enclosure time at a minimum was vital in the construction of the Solano County SB 1022 Classroom and Vocational Training Center in Fairfield, Calif. Building codes require the building be enclosed before much of the inside work begins, so Metl-Span’s HPCI Barrier Wall Panels were prescribed to keep construction moving along.
To attract and retain high-tech tenants to the Mountain View Corporate Center, the new owners invested in updating three buildings from concrete exteriors to a modern copper-colored metal panel façade
At the University of Massachusetts Amherst, a new Design Building has brought together previously dispersed departments in a LEED Gold structure that is integrated with the campus’ material palette
The new site contains more project data and photos, applications and case studies, and real-time performance data of a system installed on a warehouse/production facility.
CENTRIA announced a new addition to its Versawall product line: Versawall Non-Embossed. The new Versawall option presents a sleek, smooth exterior face.