Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Project Profiles

Corporate Campus Achieves Cohesive, Modern Design and Performance with Aluminum Framing Systems

Shamrock Trading Corp.’s global headquarters in Kansas features first Tubelite 400SS SG Curtain Wall

Shamrock Trading Corp.’s global headquarters in Kansas

Photo courtesy of Abstract Photography, Inc. | Terry Wieckert, courtesy Apogee Architectural Metals 

July 21, 2025

The newly constructed Shamrock Trading Corporation’s global headquarters is set on 34-acres at its Overland Park East Campus in Kansas. Exemplifying monolithic, modern building design, its two Class A office towers, single-story connecting building and parking garages feature aluminum framing systems by Tubelite and architectural finishes by Linetec.
 
Opened in Dec. 2024, Shamrock Tower II also showcases the first completed project example with the Tubelite 400SS SG Curtain Wall shop-glazed, fully unitized, thermally broken system. The aluminum framing features dual finishes by Linetec with architectural painted exteriors and anodized interiors. The curtain wall’s insulating glass units (IGUs) on Tower II are composed of Viracon VRE insulating glass products and its high-performance Viracon Thermal Spacer.
 

Cohesive Corporate Campus

At start of the East Campus project’s development, the architectural team at Bell/Knott & Associates contacted Doug Urich, president of ARCHON Fenestration Technologies. ARCHON is a manufacturers’ representative for Viracon and Tubelite. Tubelite and Linetec are brands of Apogee Architectural Metals and, together with Viracon, they are part of Apogee Enterprises, Inc.
 
In addition to his relationship with Bell/Knott, Urich has worked on several high-profile projects with JE Dunn Construction, which served as the general contractor for Shamrock’s global headquarters. Two glazing contractors – Structural Glass Systems and AGP – each completed separate phases of Shamrock’s East Campus construction. Urich’s involvement and the Apogee brands ensured a unified appearance that met project performance requirements.
 
 Bell/Knott & Associates initially contacted Urich for glass assistance in creating a cohesive campus design. “They were seeking an aesthetically driven, clean, modern look,” he explained. “I listened to their needs and took the opportunity to discuss the building skin, offering an approach that combined both Viracon glass and Tubelite curtain wall to achieve their intended appearance and performance, on schedule and within budget.”
 
 During the workday, Shamrock’s associates can enjoy natural light and outdoor views of its Overland Park East Campus. At night, the curtain wall’s integrated LED light blades distinctively illuminate the exterior. In 2024, Shamrock was ranked as one of America’s Most Loved Workplaces by Newsweek and was honored in multiple categories.
 
 “It’s a homerun in my book,” agreed Urich. He added, “Shamrock Tower II was extremely successful in proving Tubelite 400SS SG Curtain Wall offers a shop-glazed, fully unitized, thermal system that can save glaziers time and labor, and meet the aesthetic and performance requirements of high-profile projects.”
 

First Tower, First Impressions

The first phase of Shamrock’s corporate campus, completed in 2020, included the eight-story, 265,000-square-foot Tower I plus a one-story building with 30,000 square feet of enclosed, connecting space.
 
Architectural Systems, Inc. (ASI) supplied the shop drawings and third-party fabrication Shamrock Tower I’s Tubelite framing systems. For this first phase, glazing contractor Structural Glass Systems installed Tubelite’s pre-glazed curtain wall, storefront and doors.
 
 Multiple Viracon VRE glass products with low-e coatings and in clear, blue and gray hues were fabricated into IGUs. These were glazed into the Tubelite aluminum framing system, meeting the necessary climate conditions and building codes.

For Tower I, clear glass lites were specified for most of the building, including its segmented walls, at the center core and on the eighth floor. Also on the eighth floor, Tubelite terrace doors open onto an exterior patio in the southwest corner. Blue glass was used at the corners, adding visual interest to the exterior. Gray glass was used for Tubelite storefront and Standard Medium Stile Entrance doors at the ground level and the low-rise connecting concourse.
 
 On the north and south facades of each tower, LED light blades are vertically integrated with the curtain wall and offer programmable light effects. Tubelite’s team worked with ASI on the details and commissioned custom dies to create the desired blade profile for these decorative metal elements.
 
 Behind Shamrock Tower I and II, Tubelite framing, finished by Linetec, with glass by Viracon, also was chosen for the parking garages’ enclosed staircases and installed by Structural Glass Systems.
 

Second Tower Symmetry, Improved Performance

On the newly opened Shamrock Tower II’s 12-story, 329,400-square-foot office building, Tubelite aluminum framing systems, Viracon clear and blue glass, and Linetec finishing provided design symmetry between the two towers.
 
 Tower II used clear glass for its center core and segmented walls, and blue glass to highlight the corners. This high-performance, low-e coated glass also balances natural daylight with energy performance. Part of the IGUs on Tower II Viracon Thermal Spacer (VTS®) replaces the traditional spacer, desiccant and primary sealant with a single, better-performing component.
 
 The IGUs with Viracon glass and VTS were incorporated into Tubelite’s thermally broken framing systems, optimizing thermal performance with low U-values and achieving high condensation resistance. Glazing contractor AGP fabricated and installed the unitized Tubelite 400SS SG Curtain Wall and Therml=Block® Medium Stile Entrance doors throughout Tower II.

“Both glaziers wanted a pre-glazed, unitized approach,” noted Urich. “Shamrock Tower I features a first-generation of the curtain wall design as a hybrid, partially unitized system with exterior face caps. Tower II is the jewel; it’s a fully unitized, thermally broken system.”
 
 Both curtain wall systems were shop-glazed and have a concealed, screw-spline construction emphasizing the buildings’ smooth, monolithic style.
 

Dependable, Unitized Curtain Wall

As confirmed on Shamrock Tower II, Tubelite 400SS SG Curtain Wall allows for faster installation by pre-glazing it as a unitized system in the shop. Pressure plates and face caps also can be pre-installed when shop-glazing, saving additional time on the jobsite. This Tubelite curtain wall also has an outside-glazed pressure-plate system, available in captured and structural-glazed configurations. The horizontal member minimizes splice requirements, while accommodating expansion/contraction clearances.
 
 Tubelite 400SS SG Curtain Wall’s aluminum framing members have a 2-1/2-inch face and 7-1/2-inch depth. Its glass bite securely grips the 1-inch-thick IGUs on Shamrock’s global headquarters. The glass is positioned to the system exterior improving resistance to rainwater. The curtain wall also meets ASTM and AAMA industry standards for air, water, structural, acoustical and seismic performance. For Shamrock’s buildings, the framing also was steel-reinforced with consideration for the strong wind load.
 
 Complementing the curtain wall, Tubelite entrances are engineered for compatibility, further supporting their ease of installation. The doors’ steel tie-rod frame construction enhances their future serviceability and is backed with a lifetime warranty. The durability and adaptability of these tie-rod doors mean that worn or damaged components can be repaired and replaced without having to install an entire new door.
 

Durable, Dual-Finished Framing

Accentuating Shamrock’s East Campus modern aesthetic and an enduring positive impression, the Bell/Knot architectural team selected high-performance architectural finishes in a Silver Gray color. Linetec finished all the aluminum framing members, face caps, vertical fins and doors for Tubelite in 70% PVDF resin-based, architectural coating.
 
 As a single source solution for architectural finishing, Linetec also provided the thermal breaks and insulating barriers in Tubelite’s aluminum-framed curtain wall, storefront and Tower II entrance systems. The aluminum framing members’ exterior and interior surfaces must be separated to reduce energy transfer. This thermal break not only contributes to energy-efficient building envelopes, but it also improves condensation resistance and acoustic performance for comfortable interior spaces.
 
 Projects that choose thermally broken aluminum framing systems manufactured using polyamide thermal strips can benefit from Linetec’s dual finishing capabilities. This offers design flexibility and economic advantages to specify different finishes on the exterior and interior.

For Shamrock Tower II, the Tubelite curtain wall on floors 2 through 12 are finished on the exterior in Silver Gray and the interiors are finished in a Class I clear anodize. Both industry-leading finishes meet the highest performance standards – AAMA 2605 for painted coatings and AAMA 611 for anodized coatings. After their long lifespan on the building, the aluminum framing and components can be recycled.

The high-performance Tubelite curtain wall with Viracon glass and Linetec finishing contributed to a visually attractive, energy-efficient building envelope for Shamrock’s global headquarters. On the interior, the glass and framing systems support comfortable, healthy spaces.

Within its new, modern corporate campus, up to 1,000 employees support Shamrock’s transportation services, finance and technology brands including Ryan Transportation, RTS Financial, RTS International, RTS Carrier Services and ProTransport. The company continues to expand its employee base to serve its customers’ growing needs.
 
KEYWORDS: aluminum curtain wall doors finishes framing glass glazing

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

HITT Construction headquarters

Pushing the Envelope

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Tubelite

    Hotel Features Aluminum Framing Systems

    See More
  • Azle Elementary

    Elementary in Texas Relies on Resilient Aluminum Framing Systems

    See More
  • Tubelite

    Net-Zero-Ready Office Showcases Modern Design and High Performance

    See More

Related Products

See More Products
  • studentguidebook.jpg

    Integrating Building Performance with Design: An Architecture Student’s Guidebook

  • 1118458605.jpg

    Sustainable Facades: Design Methods for High-Performance Building Envelopes

  • ecology.jpg

    Architecture and Systems Ecology: Thermodynamic Principles of Environmental Building Design, in three parts

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing