Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Exterior CladdingsWall Systems

Renovation at Chicago Landmark is a Tall Order

Willis Tower Remodel Creates a Warmer, Welcoming Structure

By Thomas Renner
D87A5382.jpg

The project included more than 2,700 feet of architectural glass from Bendheim with various glass types. Each of the glass types achieved distinct architectural objectives. All photos courtesy of Ed M. Koziarski.

D87A5403.jpg

Workers recently completed a five-year, $500 million project at Willis Tower in Chicago, introducing 300,000 square feet of new restaurants, retail, entertainment to the existing tower. The project also included the creation of 125,000 square feet of new tenant-exclusive amenity floors.

D87A5382.jpg
D87A5403.jpg
October 12, 2021

Nearly 50 years after it opened, Willis Tower remains a prominent structure in the United States architecture landscape.

It is not merely because the Chicago edifice once held the mantle as the world’s tallest structure. Its position in the Chicago skyline, history and tourist appeal – approximately 1.7 million annual visitors flock to the Skydeck on the 103rd floor – help the skyscraper retain its status as one of the most iconic construction masterpieces. Willis Tower now ranks as the world’s 23rd tallest building and is the third tallest in the Western Hemisphere. Deep dish pizza, Wrigley Field and Willis Tower are top-of-the-tongue Chicago trademarks.

Willis Tower is 1,450 feet tall, which is nearly the equivalent of five football fields. The building, then known as Sears Tower, opened to great fanfare in 1974. London-based Willis Group Holdings brought the naming right as part of its lease, and the name was formally changed in 2009. Occupant needs and tastes also changed over time, and even with continuous upkeep, major renovations were ultimately required.

Purchased by Blackstone in 2015 and now managed by EQ Office, workers are completing a five-year, $500 million project to redevelop the structure, introducing 300,000 square feet of new restaurants, retail, entertainment, and outdoor terrace space to the existing tower, as well as creating 125,000 square feet of new tenant-exclusive amenity floors in the building, and launching the country’s largest elevator modernization project. The directive to the architect for the project, Gensler, was to create a more welcoming, warmer building.

 “The space was previously closed off to the street, an approach taken for decades in cities to ensure security,’’ Gensler architect Marissa Luehring said. “It was also designed at a time when working people didn’t necessarily live downtown, and Willis Tower was primarily a place to go to work, so there was little engagement with the streetscape and within the building. Now, what we’ve done is open the podium back up to the community.”

Inside and Out

The redevelopment required work on the outside and inside, including the base of the skyscraper.

SkB Architects led the design of the street-level experience and facade. The intent married the goals of the interior changes to make the building more welcoming.

 “With its new exterior, Willis Tower will offer an inviting and vibrant pedestrian experience while honoring the building’s role as a unique Chicago and American icon,’’ a fact sheet on the project said. “It will create a sense of place, not just a place to work.”

The exterior changes included an assortment of architectural features to create a varied aesthetic. SkB employed different textures, including white terra cotta at the Wacker and Franklin Street entrances and dark terra cotta for retail storefronts. The renovation also included a new 30,000-square foot outdoor deck and garden.

The centerpiece to the project was the five-story district at the base of the tower, called Catalog. The name pays homage to the Sears Roebuck Company, the building’s original owner. EQ Office calls Catalog a “neighborhood, with retail, dining and entertainment.”

“Catalog represents everything we love about Chicago, from the energy of the neighborhoods and the diversity of the city’s design and architecture,’’ David Moore, Senior Vice President and Portfolio Director, EQ Office, said. “The space recognizes the pace of change occurring in everyone’s lives and our need to drive lifestyle and experience into the workday. With the addition of Catalog, we are furthering our mission to create a new Willis Tower as an urban destination that is the heart of downtown, capturing the vibrancy of the city and delivering the best experiences of life and work to residents and visitors of Chicago.”

Bringing Class with Glass

A wide range of unique architectural choices were included in the project, each playing a key role, including a large, curving skylight that provides unobstructed views of the building through a diagonal grid that holds 240 panes of glass.  

Bendheim manufactured more than 2,700 square feet of customized architectural glass materials for the project. Each of the various glass types achieved distinct architectural objectives.

In creating a more welcoming venue, a rising staircase with a “red carpet” feel invites employees and visitors to ascend into the building. Backlit glass risers help create the visceral impact. More than 300 square feet of 3” x 120” safety laminated glass panels were included. “It was quite a technical challenge to design and fabricate the glass,’’ Derek Larsen of Bendheim said. “It could not be fully tempered due to the small sizes and potential issues with bowing. We also needed to determine the correct opacity for backlighting.”

Workers installed Bendheim’s Gothic glass in a hammered texture to soften up partition walls. They also help divide the space to create unique and more intimate rooms. Houdini glass, one of Bendheim’s standard products, enhances privacy around the checkpoint area in the tower.

Double-sided bronze etched mirror acts as a partition wall and 3/4 inch monolithic grey glass was installed in large doors and openings around the security areas.

“There were a lot of challenges in this project to get the appearance perfect,’’ Larsen said. “We offered different textures and opacities. Ultimately, we homed in on the correct aesthetic over many design iterations.  The project incorporates many glass types, and the end result came out gorgeous.”

Multiple Challenges

Achieving the perfect architectural balance with glass was only one of the challenges that faced design and construction teams. The bigger challenge may have been planning and executing the work, especially since the tower remained open during the entire process.

The building welcomes a mix of people, from employees who visit daily to first-time Skydeck visitors. Architects needed to design seamless areas that appealed to everyone.

“It was extremely important for us to celebrate the building and to create a space where everybody knew that they were in Willis Tower,” Luehring said. “Planning-wise, it was all about the cross section of people and how to engage across all of the different levels. We wanted to give everybody a dedicated space for their specific functions while also creating a lot of different forms of vertical transportation and mixing zones.”

Existing infrastructure posed challenges for construction teams. The combined weight of the building is 222,500 tons, with 76,000 tons of steel, 43,000 miles of telephone cable, 25,000 miles of electrical cable and 25 miles of plumbing. There are more than 100 elevators moving 1,600 feet per minute. Executing the redevelopment while remaining open on a structure of that size was like tinkering with the car engine doing 90 mph on the interstate.

“We had all of these foundations and footings, and we had to figure out how to put in a new building that doesn’t have to tie into anything that’s underneath it or on top of it,’’ Luehring said. “And we still had thousands of tourists and thousands of working people coming into the building every single day.”

While the design and construction presented challenges, perhaps the most daunting aspect of the project was incorporating the tower in the fabric of the city. While a lot of skyscrapers have the charm of a tombstone, the renovation at Willis Tower sought to unite all users of the building with the street and establish a strong community connection.

“We wanted the experience of the building to really feel like Chicago,’’ Luehring said. “There are so many different types of people in the city, and with Willis Tower being such an iconic building, it is a popular destination, especially for people who are visiting Chicago for the first time. It’s a great place for residents to show off their city and kind of get that cross section of all of Chicago in one place.”

Attention to Detail

It is important to get the small details exactly right in any project, especially in a momentous building. Every architectural choice was carefully researched, and construction teams needed to bring their finest skills. With more than 25,000 daily visitors, including 15,000 employees, the building’s features are continuously scrutinized.

Architects crossed the world to visit other mixed use buildings to inspect finishes, and learn more about how to combine world-class office space with fun and interesting areas for visitors. Finding the right balance requires extraordinary commitment to detail, and the finished project at Willis Tower accomplishes that objective.

“It feels really special to be part of the team that helped put this project together because it was a massive team effort,’’ Luehring said. “It was a long labor of love to bring the vision to life, and we feel very proud and excited that Gensler was able to be part of it.”

KEYWORDS: glass skylight

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Thomas Renner writes frequently for U.S. trade publications on construction, building, manufacturing and more. He can be reached at trenner@catalystmc.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • interior AVB (Air & Vapor Barrier) and exterior facade repairs to a building

    Western Specialty Contractors Mitigates Building Envelope Air, Moisture Infiltration Issues at Chicago Medical Center

    See More
  • Raising the Bar: Innovation, Science and Technology Building at Florida Polytechnic Is a Functional Work of Art

    See More
  • 10-7-16 Living Sustainable

    Is a Vapor Retarder Necessary in a Low-Slope Roof Assembly?

    See More

Related Products

See More Products
  • foundation.jpg

    Tall Building Foundation Design

  • tall building.jpg

    Tall Building Design: Steel, Concrete, and Composite Systems

  • 0470872616.jpg

    Sustainable Renovation: Strategies for Commercial Building Systems and Envelope

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing