Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Project Profiles

Renovation Adds to Historic University Hall

Pioneer Hall
April 23, 2018

Construction is well underway on a $104.5 million renovation and addition to the University of Minnesota's historic Pioneer Hall. Design architect KWK Architects, partnered with architecture/engineering firm-of-record TKDA of St. Paul, Minn., was contracted to transform the aging residence hall into a modern living space for the university's students.

Constructed in stages from 1928 to 1932, Pioneer Hall is one of the oldest residence and dining halls on the U of M Twin Cities campus. University officials debated for several years over whether to completely renovate or tear down and replace the outdated structure, which did not meet current building codes and was not handicap accessible. It was also plagued with narrow corridors, small rooms and bathrooms, poor layout, limited social/study space, no air-conditioning, outdated electrical and plumbing systems, and a subterranean dining facility.

The project was approved as a capital budget amendment to the FY2017 Capital Budget by the university's Board of Regents in September 2016 and the schematic design was approved by the Board of Regents in May 2017.

The project will retain the character-defining features of the existing building, while strategically expanding the building footprint to improve housing and dining programs. The housing component will increase the number of beds to 756, while aligning program delivery and student amenities with comparable university facilities. The plan also incorporates study and community spaces to enhance the first-year student experience.

The dining program will be raised up to grade level, and seating capacity expanded to serve the student population of the Superblock while offering expanded meal, serving and seating options. Seating capacity for the new dining facility will accommodate 850 students at any given time.

The renovation provides for full ADA Accessibility, mitigating a significant deficiency in the existing building, as well as an open and welcoming lobby area featuring meeting spaces, business/technology center and recreation room.

Community-style living unit modules with small groups of residents sharing a community bathroom and other building support spaces such a meditation rooms and lounges are also planned.

When complete, Pioneer Hall will have approx. 257,000 square feet, with 85,600 square feet of renovated space and 171,400 square feet of new construction.

"The former Pioneer Hall had very limited public space and most of it was below grade. What we are able to achieve in the new design is a lot more public space for students to gather and to leave their rooms to interact and to socialize, as well as study," said Daniel Elliott, U of M Associate Director of Facilities, Housing and Residential Life.

The project follows the State of Minnesota Sustainable Building Guidelines and meets the Minnesota SB2030 Energy Standard. Delivered via a Construction Manager at Risk, McGough Construction of St. Paul, Minn., the new Pioneer Hall is slated to open for the Fall 2019 semester.

KEYWORDS: academic building renovation

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Hydropack Roof Garden System.jpg

    Historic Building Renovation Adds Green Roof

    See More
  • Harvard University.png

    Bruner/Cott Architects Completes First Phase of Renovation on Harvard University's Gund Hall

    See More
  • Hyatt PA

    Hotel Adds a Modern Edge to Historic Community

    See More

Related Products

See More Products
  • 0470872616.jpg

    Sustainable Renovation: Strategies for Commercial Building Systems and Envelope

  • building codes illustated.jpg

    Building Codes Illustrated: A Guide to Understanding the 2021 International Building Code, 7th Edition

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing