Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Exterior CladdingsProject Profiles

The Largest Historical Redevelopment in Texas

The Drever
The Drever2
The Drever
The Drever2
August 4, 2017

Drever Capital Management’s 1.5-million-square-foot re-development of the former First National Bank of Dallas building in the heart of the Dallas Central Business District at 1401 Elm Street, has commenced removal and restoration of the historic marble slab panels on the building’s façade.
 
Legendary Texas oilman H.L. Hunt sought the highest quality materials available during the construction of the historic building, originally importing the dense, handsomely veined white marble slabs from the same quarry in Greece as the marble used to build the still-standing Parthenon.
 
Steve McCoy, president of Drever Construction Co. worked with lead architect, Merriman Anderson/Architects, and contractor, Andres Construction, to develop a solution to remove, restore and reinstall the slabs with new connections that will secure and stabilize the tower’s exterior for decades to come. The process provides a surplus marble and terrazzo that, to the delight of the project’s interior designers, will be reutilized in the building’s interiors.  The project is scheduled to be complete in the first quarter of 2018.   
 
“We’re eager to get this project underway,” says Steve McCoy. “The process will allow this irreplaceable stone to not only be restored to its former glory, but remain as a sound element of the building’s structure for many years to come. The fact that the team was able to find a way for the excess marble to be repurposed adds another layer of history to this already impressive structure.”
 
Now known as The Drever, the skyscraper was originally designed by architects George Dahl and Thomas E. Stanley and has been home to Hunt Oil, the Dallas Petroleum Club, and the fictitious J.R. Ewing’s staged office set for Ewing Oil in the television hit program, “Dallas”.
 
The mid-century 50-story tower’s distinctive façade was often compared to the pin-striped fabric of a traditional banker’s suit because of the repeating pattern of white marble and dark gray floor-to-ceiling windows. The Drever re-development will include a luxury high-rise offering 324 residential units, a Thompson Hotel planned with 218 rooms, spa, retail, office and destination restaurants.  
 
Dallas-based architects, Merriman Anderson/Architects, are the lead architects and designers designing the reimagined interior and exterior, and are delighted with the decision to recycle the existing marble panels. Andres Construction is the construction manager overseeing the overall building project.
 
“The original marble is from Mount Pentelikon, a mountain range located in Attica, Greece,” says Aimee Sanborn, AIA, principal with Merriman Anderson/Architects. “It’s a beautiful natural stone with wonderful veining.  We were able to locate the quarry in Greece and have identified the exact species. To re-purpose 100% of the existing exterior marble tells a compelling cradle-to-cradle story of up-cycling.”
 
The condition of the panels and the integrity of the building’s engineering necessitated the decision to refurbish the marble. Existing mechanical connections were separating from the original structure. The panels will be refurbished by cladding the natural stone to a structural aluminum honeycomb backer panel, which will insure the engineering integrity and the historical value of the original marble slabs.
 
HyCOMB USA is responsible for the stone cutting and the application of the new structural aluminum honeycomb panel. Besides creating extra marble slabs for the building interiors, marble remnants from the cutting and cleaning process will be crushed and repurposed into terrazzo to be utilized in the elevator cab floors, elevator lobby flooring and flooring on the 9th floor amenity deck.
 
“I commend Drever Capital Management for their unwavering commitment to the quality of this project,” remarked Jerry Merriman, AIA, president of Merriman Anderson/Architects. “Re-purposing is generally more expensive and time consuming than demolishing and replacing with new. The building’s owner, Maxwell Drever, appreciates the significance of this building to the history of downtown Dallas.”
 
The Drever
Located on an entire Dallas city block at Elm Street, Pacific Avenue, Akard Street and N. Field Street, plans for The Drever mixed-use project include best-in-class multi-family, hotel, retail, restaurants, office, spa and parking. The 50-story, 1.5-million-square-foot skyscraper is designed to offer a luxury residential and best in class boutique hotel option with contemporary, inviting and culturally rich public and private spaces.  
 
When completed, The Drever’s eight-story tower base will be transformed into a dynamic area with more than 27,000-square-feet of ground floor retail space, 44,000-square-feet of office space, the hotel and residents’ lobbies and a grand ballroom.  A wraparound amenity deck with sightlines to surrounding buildings, including a resort quality pool, a spa, a health and fitness room, dog-park and outdoor recreation spaces will be on the 9th floor at the top of the base element. The 50th floor will feature an open-to-the-public observation deck.
 
Juxtaposed near luxury iconic Dallas retailer, Neiman-Marcus, and also the Dallas Area Rapid Transit’s (DART) Akard Street Station, The Drever is within walking distance of the Dallas Arts District, Klyde Warren Park, downtown restaurants and office towers. For further information, visit https://thedreverdallas.com.

KEYWORDS: building façade restoration

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

2 construction workers and a DEXcell panel

Designing Low-Slope Roofs for Resilience

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Sprayfoam Show 2021 Logo

    The Sprayfoam Show 2021 Convention & Expo to be Held in Texas

    See More
  • HALL Arts Residences

    First WELL Multifamily Development In Texas

    See More
  • Azle Elementary

    Elementary in Texas Relies on Resilient Aluminum Framing Systems

    See More

Related Products

See More Products
  • energy modeling.jpg

    Energy Modeling and Computations in the Building Envelope

  • ecology.jpg

    Architecture and Systems Ecology: Thermodynamic Principles of Environmental Building Design, in three parts

  • interior design.jpg

    Building Systems in Interior Design

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing