Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Metal Roofing MaterialsProject Profiles

Energy-Efficient DMV Facility Earns LEED Silver

PAC CLAD
PAC CLAD2
PAC CLAD3
PAC CLAD4
PAC CLAD
PAC CLAD2
PAC CLAD3
PAC CLAD4
August 22, 2016

The sprawling, sparkling Delaware Division of Motor Vehicles facility sets a new standard in both energy efficiency and customer service. The brand new 43,000-square-foot facility, located in New Castle, Del., is the first state-owned building to achieve LEED Silver certification, and is the third DMV office to follow a design prototype established to optimize the customer experience.
 
Architectural design for the project was provided by Bernardon Haber Holloway Architects in Wilmington, Del. “From a design point of view, we were generally replicating the prototype that had been successful for the state. The previous two buildings had light green standing seam metal roofs, so that was a foregone conclusion for this facility,” said Bill Holloway, principal in charge for BHHA.
 
“We had the flexibility to select any quality metal panel manufacturer. Our firm uses lots of metal on various projects and most clients are fairly budget-conscious. Petersen is a manufacturer we regularly look at and was the competitive bidder,” Holloway said. The facility boasts five different PAC-CLAD roof and wall products.
 
Holloway credited the PAC-CLAD Arcadia Green color with contributing to the building’s LEED certification. Approximately 34,000 square-feet of Petersen’s 24 gauge Snap-Clad panels finished in Cool Color Arcadia Green was installed on the roof of the administration building. “The color very easily met the reflectivity requirements, and that added to the ability of the building to be sustainable and meet the LEED Silver standards,” Holloway said.
 
The facility includes a 22,000-square-foot administrative building and an attached 21,000-square-foot vehicle inspection area with seven individual inspection lanes and four drive-through teller windows.
 
Four other Petersen profiles also contributed to the design of the structure. Approximately 6,000 square-feet of PAC-CLAD 7.2 Panels in Arcadia Green and Sandstone were utilized on the walls of the facility’s inspection wing. The 7.2 Panels replaced a competitive panel that was initially installed but replaced to provide a better architectural look.
 
A limited amount of Precision Series wall panels, 7/8-inch Corrugated panels and Flush Panels also were strategically utilized on the inspection station area of the complex. All were finished in Bone White.
 
Installation of all Petersen profiles was done by Apostle Construction in Salisbury, Md. The Snap-Clad panels used on the administration building were extra-long, reaching 70 feet. “We used a special crane and bar to put them on the roof,” said Robert Brooks, project manager. “The other challenge was dealing with the various intersecting pitch changes. We custom-fabricated a lot of trim on-site.”
 
Apostle Construction has extensive experience with PAC-CLAD products. “I think we’ve pretty much used all of the profiles Petersen offers. We had excellent coordination on this project with the architect and with Petersen. That’s really the key to getting the job done right and on time,” Brooks said.
 
The finished job has earned rave reviews, including one from Jennifer Cohan, director of the Delaware Division of Motor Vehicles. “It’s a state-of-the-art facility. Not only was it designed to be certified LEED Silver, but it’s going to save us operating dollars in the future. The most important thing is providing quick and efficient service. Our employees in New Castle love their new home, and we’re hoping the citizens of Delaware like it as well,” she said.

The design/build team was led by Wholsen Construction in New Castle, Del.

For more information on the complete line of Petersen metal products, visit pac-clad.com.

KEYWORDS: energy efficiency LEED metal panels metal roofing

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

skyscraper

NYC Tower Failure Offers Warning for Contractors

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Pac Clad Health Center

    Health Facility’s LEED Silver Design Reflects Cherokee History

    See More
  • EFCO_LA-ThibodauxWellness_TedMiles2.jpg

    Louisiana’s LEED Silver Thibodaux Regional Wellness Center Showcases Hurricane-Resistant Curtainwall

    See More
  • Saint Luke’s Multispecialty Clinic

    Clinic Achieves LEED Silver Certification

    See More

Related Products

See More Products
  • 9780128207918.jpg

    Eco-efficient Materials for Reducing Cooling Needs in Buildings and Construction 1st Edition

  • facility.jpg

    The Facility Manager's Guide to Safety and Security

  • bim-3e.jpg

    BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd Edition

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing