Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!

Restoring a Three-Level Parking Garage

Western Specialty Roof Deck
May 19, 2016

Crews with the Western Specialty Contractors - Atlanta, Ga. branch recently completed a one-month project to repair, restore and protect a three-level, concrete parking garage used by Nalley Ford of Sandy Springs, Ga. to store new car inventory.

Western crews surveyed each parking deck individually to determine specific damage for each, then provided the owner with a detailed outline of recommended work needed to restore each level. The dealer worked to sell down inventory and rotate his vehicles to make room in the garage for Western's crews to begin work.

Top Level

Western crews began restoration of the top level, which is most exposed to the elements, by cleaning all concrete surfaces using a high-pressure water blaster (3,000 psi). Once the pressure washing was complete, Western crews heavily saturated the concrete surfaces with an Enviroseal 20 clear penetrating sealer. Approximately 5,580 lineal-feet of existing cracks and control joints were routed, then sealed with a urethane sealant. Western crews went on to remove approximately 318 lineal-feet of existing sealant around the perimeter joint, then lightly grinded the joint edges to remove any loose residual sealant. A new urethane sealant was then applied.

A total of 1,300 square-feet of new pour strips were installed to allow for expansion/contraction of the concrete intersections. Slab areas, perimeter column caps and exterior wall weld plate embeds where deteriorated/cracked concrete was detected were saw cut and chiseled out and replaced with new concrete.

At the exterior wall joints, approximately 550 lineal-feet of existing sealant was removed, grinded down and replaced with a new urethane sealant. Oxidation at the exterior wall weld plates was removed and an epoxy chromate primer and urethane top coat applied.

To complete the top level restoration, Western crews applied two coats of Thorolastic elastomeric coating to approximately 8,160 square-feet of wall substrate and applied an Autogard FC traffic-deck coating system manufactured by Neogard to the deck.

Intermediate Level

Western crews cleaned all concrete surfaces using a high-pressure water blaster, routed approximately 5,580 lineal feet of existing cracks and control joints, then sealed them with a urethane sealant. Approximately 540 lineal-feet of existing sealant around the perimeter joints was removed and replaced with a urethane sealant. Oxidation on corbal bearing plates and double tee bearing plates was removed and refinished with an alphatic urethane top coat. The precast wall perimeter was also re-sealed and repairs were made to damaged columns, which were resealed with two coats of an anti-corrosion bond inhibitor. Damaged concrete on the slab floor was saw cut and chipped out and replaced with new concrete.

Lower Level

On the lower level, Western crews removed oxidation on the gusseted steel corbeis, spanning plates and double tee bearing plates, then applied an alphatic urethane top coat. Deteriorated concrete around the beams was removed, any damaged steel replaced and the beams patched with new concrete. On areas where steel web was showing as a result of deteriorating concrete, the surrounding concrete was removed, the damaged steel was replaced and the area patched with new concrete.

The techniques and materials used by Western to restore the parking garage will protect it for many years to come.

KEYWORDS: concrete restoration

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • A 1. Lot H Parking Garage.jpg

    Perforated Metal Panels Showcased on Award Winning Parking Garage

    See More
  • wire mesh

    Parking Garage Screening is Moving Full Speed Ahead

    See More
  • VyStar Parking Garage

    Backlit Perforated Panels Create Sculptural Effect on Parking Garage

    See More

Related Products

See More Products
  • ecology.jpg

    Architecture and Systems Ecology: Thermodynamic Principles of Environmental Building Design, in three parts

  • revisited.png

    Markup & Profit: A Contractor's Guide Revisited

  • net zero.jpg

    Net Zero Energy Design: A Guide for Commercial Architecture

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing