Roofing isn’t the easiest of trades and each roofing project presents its own challenges. The installation of a traditional roofing system can be summarized, albeit simplistically, as the installation of the insulation, membrane, and possibly surfacing, and then the installation of all of the flashing work necessary to complete the roofing installation. If this theoretical installation is a reroofing project, then there are more “steps,” such as removal of the existing roofing system and inspection of the substrate.
The emergence of garden or “vegetative” roofing systems has introduced a whole new level of complexity for the roofing contractor with directly proportional opportunities for there to be miscommunication, design errors, scheduling errors, and installation mishaps. Many roofing contractors may choose to ignore this market segment, and why not? It’s a very small portion of the U.S. roofing market and there is a disproportionate level of expertise that one must learn to have confidence in one’s ability to complete an installation successfully. Other roofing contractors will jump in with both feet and learn from their mistakes - although this could prove to be a very costly method of gaining expertise. And other roofing contractors will understand that while this market is small, it has many drivers that are fueling its growth. Roofing contractors will do all they can to learn about this growing market segment, what might be important for them to know about vegetative roofing systems and what opportunities there are to expand their business.
For those that choose to ignore this market, the following list might not be of too much use, although it is “roofing” and there is usually something to be learned, even in a discussion that does not directly affect your business; for those that have already “jumped in,” you might have additional words of wisdom that you could add or at least concurrence as you read the following list; and for those that are trying to avoid problems and costly mistakes, hopefully this list will prove useful.
Top 10 Vegetative Roof Mistakes
10. Not considering general garden roof requirements. These systems do have certain requirements beyond a traditional compact/low slope installation, such as the need to ensure the load bearing capability/capacity of the structure.9. Not considering site/location conditions. Each project and site has its own peculiarities, and a vegetative roofing system may have additional needs that can interfere with realizing the best installation possible. For example, if the system being installed doesn’t have to be irrigated for the long term, but must have intermittent irrigation for the first few years, how will that be accomplished? Is the vegetation selected appropriate for that micro-climate and the climate in general where the building is located?
8. Poor timing and construction sequencing. Planting vegetation in December in Detroit probably isn’t a good idea. Or using the vegetative roof as a staging area for adjacent construction would probably a better idea prior to the installation of any overburden and or any components above the waterproofing membrane.
7. Failure to utilize vegetative-free zones. These areas where the vegetative roofing system is “held back” allow for access to other components that are on the roof, such as equipment and base flashings. They also can be important when designing for wind uplift resistance and meeting codes and standards.
6. Failure to conduct “meetings.” The importance of communication between all of the parties that have a part in a successful installation can’t be overstressed - and using pre-bid, pre-job, and job closeout meetings to make sure that everyone understands their role and their responsibilities can have a huge impact on obtaining a successful installation.
5. Lack of instruction for the proper care and feeding of the vegetative roof. Too often, once the roof is installed it is forgotten, and with a vegetative roofing system, this can have horrible consequences for the property owner. The property owner should readily understand what their responsibilities are, including the need for irrigation, weeding, etc.
3. Failure to perform water testing. The waterproofing component of a vegetative roof assembly is covered several layers of additional components and water testing of the waterproofing membrane is generally a very good idea. It’s much easier to fix a problem prior to the installation of the overburden and certainly much less costly.
2. Leaving out necessary components. Is there a need for a root barrier? Is there a need for a water retention layer? Does the choice in vegetation require an irrigation system? There can be complete failure of the vegetative roofing system if a component is not installed because it was considered unnecessary.
1. Forgetting that everything is secondary to keeping water out of the building. There are many involved in a successful installation and, all too often, too many of those involved don’t understand the waterproofing component and how critical it is to their success. Roofing, by its very nature, is about keeping water out of a building, and this primary requirement needs to be respected by everyone involved.
While many involved in vegetative roofing systems might be offended by the saying that “there are too many cooks in the kitchen,” recognizing that there are “a lot of cooks in this kitchen” is certainly appropriate. And it’s up to the roofing contractor to stand firm and be the advocate for the waterproofing integrity of the installation.