Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!

A Top 10 List for Vegetative Systems

By Helene Hardy Pierce
July 15, 2009
Roofing isn’t the easiest of trades and each roofing project presents its own challenges. The installation of a traditional roofing system can be summarized, albeit simplistically, as the installation of the insulation, membrane, and possibly surfacing, and then the installation of all of the flashing work necessary to complete the roofing installation.


Designers of green roofs must know the function of each component and how it interacts with each of the other parts of the assembly.


Roofing isn’t the easiest of trades and each roofing project presents its own challenges. The installation of a traditional roofing system can be summarized, albeit simplistically, as the installation of the insulation, membrane, and possibly surfacing, and then the installation of all of the flashing work necessary to complete the roofing installation. If this theoretical installation is a reroofing project, then there are more “steps,” such as removal of the existing roofing system and inspection of the substrate.

The emergence of garden or “vegetative” roofing systems has introduced a whole new level of complexity for the roofing contractor with directly proportional opportunities for there to be miscommunication, design errors, scheduling errors, and installation mishaps. Many roofing contractors may choose to ignore this market segment, and why not? It’s a very small portion of the U.S. roofing market and there is a disproportionate level of expertise that one must learn to have confidence in one’s ability to complete an installation successfully. Other roofing contractors will jump in with both feet and learn from their mistakes - although this could prove to be a very costly method of gaining expertise. And other roofing contractors will understand that while this market is small, it has many drivers that are fueling its growth. Roofing contractors will do all they can to learn about this growing market segment, what might be important for them to know about vegetative roofing systems and what opportunities there are to expand their business.

For those that choose to ignore this market, the following list might not be of too much use, although it is “roofing” and there is usually something to be learned, even in a discussion that does not directly affect your business; for those that have already “jumped in,” you might have additional words of wisdom that you could add or at least concurrence as you read the following list; and for those that are trying to avoid problems and costly mistakes, hopefully this list will prove useful.

It must be determined if a root barrier or water retention layer is needed.

Top 10 Vegetative Roof Mistakes

10. Not considering general garden roof requirements. These systems do have certain requirements beyond a traditional compact/low slope installation, such as the need to ensure the load bearing capability/capacity of the structure.

9. Not considering site/location conditions. Each project and site has its own peculiarities, and a vegetative roofing system may have additional needs that can interfere with realizing the best installation possible. For example, if the system being installed doesn’t have to be irrigated for the long term, but must have intermittent irrigation for the first few years, how will that be accomplished? Is the vegetation selected appropriate for that micro-climate and the climate in general where the building is located?

8. Poor timing and construction sequencing. Planting vegetation in December in Detroit probably isn’t a good idea. Or using the vegetative roof as a staging area for adjacent construction would probably a better idea prior to the installation of any overburden and or any components above the waterproofing membrane.

7. Failure to utilize vegetative-free zones. These areas where the vegetative roofing system is “held back” allow for access to other components that are on the roof, such as equipment and base flashings. They also can be important when designing for wind uplift resistance and meeting codes and standards.

6. Failure to conduct “meetings.” The importance of communication between all of the parties that have a part in a successful installation can’t be overstressed - and using pre-bid, pre-job, and job closeout meetings to make sure that everyone understands their role and their responsibilities can have a huge impact on obtaining a successful installation.

5. Lack of instruction for the proper care and feeding of the vegetative roof. Too often, once the roof is installed it is forgotten, and with a vegetative roofing system, this can have horrible consequences for the property owner. The property owner should readily understand what their responsibilities are, including the need for irrigation, weeding, etc.

Photo Courtesy of GAF Materials Corporation

4. Improper choice of components. Some approach the selection of the components of a vegetative roofing assembly in a piecemeal manner. This can work if they understand the critical feature of each component and how it interacts with each of the other parts of the assembly. If they don’t have this knowledge, there can be problems if components are chosen without consideration of how they contribute to the overall performance of the system and don’t function together properly. And many have heard horror stories of those that thought that the “growing medium” was garden soil or just plain “dirt.”

3. Failure to perform water testing. The waterproofing component of a vegetative roof assembly is covered several layers of additional components and water testing of the waterproofing membrane is generally a very good idea. It’s much easier to fix a problem prior to the installation of the overburden and certainly much less costly.

2. Leaving out necessary components. Is there a need for a root barrier? Is there a need for a water retention layer? Does the choice in vegetation require an irrigation system? There can be complete failure of the vegetative roofing system if a component is not installed because it was considered unnecessary.

1. Forgetting that everything is secondary to keeping water out of the building. There are many involved in a successful installation and, all too often, too many of those involved don’t understand the waterproofing component and how critical it is to their success. Roofing, by its very nature, is about keeping water out of a building, and this primary requirement needs to be respected by everyone involved.

While many involved in vegetative roofing systems might be offended by the saying that “there are too many cooks in the kitchen,” recognizing that there are “a lot of cooks in this kitchen” is certainly appropriate. And it’s up to the roofing contractor to stand firm and be the advocate for the waterproofing integrity of the installation.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Helene Hardy Pierce is Vice President of Technical Services, Codes, & Industry Relations for GAF Materials Corporation. For more information, visit www.gaf.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • spri

    SPRI to Revise and Re-canvass Wind Design Standard for Vegetative Roof Systems

    See More
  • Tremco Proglaze ETA Selected as a BuildingGreen Top 10 Product

    See More
  • ARW University Webinar Preview: Top 10 Considerations for Specifying a Single Ply Membrane in 2013

    See More

Related Products

See More Products
  • 0470872616.jpg

    Sustainable Renovation: Strategies for Commercial Building Systems and Envelope

  • net zero.jpg

    Net Zero Energy Design: A Guide for Commercial Architecture

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing