Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!

Basics of Bulk Water Management through Rainscreens

By Daniel Overbey
April 29, 2015

The building envelope must face a number of damage functions: bulk and capillary water, air-born water, vapor, radiation (ultraviolet degradation), pests, and people. But even in dry climates, water in all its forms perhaps poses the greatest challenge to building performance and longevity—and bulk water is public enemy number one.

In general, there are four basic approaches to bulk water management in a wall assembly:

1. Barrier

Barrier surfaces are designed to shed water without allowing any moisture penetration. Barrier-type exterior insulation finish systems (EIFS) exemplify the barrier system.

2. Mass 

Traditional uses of concrete, masonry, timber structures, and other solid assemblies that are capable of serving as hygric buffers will shed most bulk water, absorb the remainder, and slowly release the absorbed moisture as a vapor.

3. Internal drainage plane

The plane located between the exterior cladding and supporting wall that serves as a redundant moisture barrier. Stucco or clapboard walls will often contain a dedicated internalized drainage plane.

4. Rainscreen

Rainscreens manage moisture through cladding, an air cavity, a drainage plane, and an airtight supporting wall system. These systems diminish the various forces of moisture-drive into a wall assembly.

In both teaching and practice, I’ve found rainscreens to be broadly misunderstood. I offer the following as a primer to differentiate between the basic types of rainscreens.

Two Basic Types of Rainscreens

rainscreen

Diagrams of a Drained/Back Vented (Open) rainscreen and a Pressure Equalized Rainscreen (PER).
Illustration property of Daniel Overbey.

 

 

The term rainscreen has been generalized in the building design and construction industry. In essence, there are two basic type to rainscreen:

 

  • Drained/Back Ventilated (D/BV)
  • Pressure Equalized Rainscreens (PERs)

Drained/Back Ventilated

In this broad category of rainscreens, a continuous air space is provided. In some fashion, an air space between the cladding and exterior wall must be open enough to facilitate drainage and drying.

Ventilated rainscreens are open at the top and bottom of the air space to allow airflow and convective drying when water works its way behind the cladding through wind-driven rain, bulk water shedding, capillary action through the cladding, and so on. This interstitial cavity should be protected from bulk water and pests with overhangs and screens. 

Vented rainscreens are open at the bottom of the air space. These systems encourage drainage but do not have sufficient airflow to enable convective drying.

Open rainscreens feature cladding with completely open vertical and horizontal joints. The drainage plane in this variety of D/BV rainscreen will be exposed to ultraviolet (UV) radiation, which could degrade the system over time.

In general, D/BV rainscreens are most appropriate for climates with less than 60 inches of annual precipitation.

rainscreen

Photograph of the Simon Skjodt International Orangutan Center (IOC) at the Indianapolis Zoo. The primary facade is protected by a drained/back ventilated (open) rainscreen. Photograph property of Browning Day Mullins Dierdorf.
 
 
 
rainscreen
 
 
Plan detail of the IOC's south facade where the D/BV (open) rainscreen transitions to the primary exhibit's curtainwall system. Notice that the glass fiber reinforced concrete (GFRC) cladding panels are supported by a system of vertical and horizontal struts. The interstitial air cavity is completely open, as are the joints around the rainscreen's GFRC cladding panels. Image property of Browning Day Mullins Dierdorf.

rainscreen

Section detail of the IOC's south facade where the D/BV (open) rainscreen terminates at the glulam trellis system.
Image property of Browning Day Mullins Dierdorf.

Pressure Equalized Rainscreens 

This category of rainscreens is effective in all climates and provide a great option for locales that receive more than 60 inches of rain per year. PERs are advanced version of simple D/BV rainscreens. They integrate porous exterior cladding with compartmentalized air spaces, generous ventilation, and a support wall that is tight to both air and water.

PERs get their name because they terminate wind-induced pressure differentials across the cladding system. The compartmentalized air cavity promotes rapid air pressure equalization—thus, minimizing moisture intrusion. When wind-driven air enters openings in the bottom of the cladding system, the air mass in the compartment “pushes back” as it has nowhere to escape. This prevents wind-driven rain from entering the wall system. If a small amount of rain is driven into the cavity, the same openings allow the water to drain via gravity. PERs are typically employed in several commercial cladding systems, such as metal panel systems.

All types of rainscreen systems require carefully coordinated design and detailing. As a result, they may be more expensive than other cladding options. However, especially in wet climates, they may encourage greater resistance to moisture-related forces by keeping moisture off of the wall assembly.

rainscreen

Rendering of the CityWay YMCA in Indianapolis, Indiana (currently under construction). Among other systems, the facility utilizes a PER system in the form of a metal panel cladding along the fascia and soffit of the signature roof feature. Image property of Browning Day Mullins Dierdorf.
 
rainscreen
CityWay YMCA shop drawing of the pressure equalized rainscreen (PER) comprised of metal panel cladding. This particular section detail illustrates the fascia/soffit transition. The dashed line denoted by note 22 indicates the pathway for bulk water to escape the PER system at the weep locations (identified by the dotted grey rectangles). 
Image courtesy of Browning Day Mullins Dierdorf.
KEYWORDS: cladding EIFS rainscreen walls

Share This Story

Overbey   head shot 2020 3

Daniel Overbey, AIA, NCARB, LEED Fellow (LEED AP BD+C, ID+C, O+M), WELL AP is an Assistant Professor of Architecture at Ball State University and the Director of Sustainability for Browning Day in Indianapolis, Ind. His work focuses on high-performance building design and construction, environmental systems research, green building certification services, energy/life-cycle assessment modeling, and resilient design. He can be reached at djoverbey@bsu.edu.

Recent Comments

These are actually very helpful tips. It is...

This is the most beneficial blog for all...

This blog is a great resource for anyone...

Thank you for sharing this important information. I...

This is a very interesting subject of the...

Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

skyscraper

NYC Tower Failure Offers Warning for Contractors

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing