To eliminate the thermal bridge, the specification must introduce a thermal break between the existing structure and the new roof system. A Metal-over-Metal recover system achieves this through a three-component assembly: Flute-Fill Insulation, Tall Clips, and an Air Gap.
Mark Graham, Vice President of Technical Services for the National Roofing Contractors Association, joined us to talk about some current, technical events going on in the commercial roofing industry.
87,000 sq. ft. of the panels in a Graphite finish were used in the project
July 11, 2025
Designers, along with the installation team from Raleigh-based Baker Roofing Services, specified PAC-CLAD Tite-Loc Plus panels from Petersen for these buildings.
Just the talk of steel and aluminum tariffs have already manifested in missed project budgets and lost time for architects. With higher material costs on the horizon, architects are focusing on minimizing the risks of exceeding project budgets.
PSMJ Resources, Inc. together with METALCON, is calling on industry partners to support the PSMJ Disaster Rebuilding Fund, an organization focused on rebuilding communities affected by natural disasters. Founder and CEO, Frank A. Stasiowski, sat with us recently to discuss how the industry can help with this initiative.
A new metal roofing installation is a good value, but still a significant investment, and a warranty improves the overall value and ownership experience in several ways.
Reoccurring roof leaks were becoming a problem with the original standing seam metal roof at this hub of activity.
The project required 4,600 linear feet of Roof Hugger’s Model T, a 4-1/2-inch-tall sub-purlin for typical 24-inch on-center rib trapezoidal standing seam panel.