Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Breaking NewsProducts

Simpson Strong-Tie Introduces New Fire-Rated, Load-Tested Fire Wall Hangers for Wood-Framed Multifamily Construction

f38acbe4efaf926163c46df24ea1b51b.jpeg
July 7, 2023

Simpson Strong-Tie, the leader in engineered structural connectors and building solutions, has introduced a new line of fire wall hangers designed to install with a power nailer during framing, saving time before hanging drywall and keeping construction projects on schedule. The Simpson Strong-Tie® patent-pending DGT™ and DGHT™ fire wall hangers are designed for floor-to-wall connections in multistory, multifamily construction. They carry a two-hour fire rating and install quickly and easily to help improve productivity and efficiency on busy multifamily jobsites. 

For the past several years, the fastest-growing segment of new residential construction has been wood-framed multifamily housing. According to the National Association of Home Builders (NAHB), apartment builders are forecast to bring 555,000 new homes to the market in 2023, with especially robust construction activity predicted in densely populated downtown core markets and large metro suburbs. 

Load rated for fastening with either power-driven or hand-installed nails, the Simpson Strong-Tie DGT and DGHT fire wall hangers can be attached before drywall installation to speed sequencing of trades on the jobsite. They’re also designed as one-piece connectors with no welding or additional components required, resulting in quicker lead times. 

“Building code requirements for Type III construction have created the need and demand for floor joist hangers that can attach floors to walls without adversely affecting the fire-resistive rating of the wall,” says Bryan Wert, director of Connectors & Lateral Systems at Simpson Strong-Tie. “With options for standard, heavy-gauge, skewed, and concealed options, the new DGT and DGHT hangers provide engineers and construction crews with flexibility to make strong connections across a variety of multistory wood-framed applications and achieve a consistent fire rating quickly and easily.” 

For suppliers, the introduction of the DGT and DGHT fire wall hangers also represents a strategic reduction in SKU count, making it easier to stock on-hand inventory to meet demand. 

Widely available and backed by expert service and technical support from Simpson Strong-Tie, the new fire wall hangers have been tested according to ASTM and are code-listed in the IRC and IBC. To learn more, visit go.strongtie.com/dgt or go.strongtie.com/dght. 

KEYWORDS: construction drywall framing multi-family buildings

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • d1fd197f15eb73fe386d3d30f14047ac.jpg

    Simpson Strong-Tie Introduces New AT-3G Hybrid Acrylic Anchoring Adhesive Designed for Faster Curing Times in Extreme Environments

    See More
  • simpson strong tie

    Simpson Strong-Tie Achieves UL-Listed Fire Protection Ratings on RTUD and ATUD Strong-Rod Components

    See More
  • Simpson High Wind Guide

    Simpson Strong-Tie Adds New Construction Guide for Protecting Against High-Wind Forces

    See More

Related Products

See More Products
  • 9780128207918.jpg

    Eco-efficient Materials for Reducing Cooling Needs in Buildings and Construction 1st Edition

See More Products

Events

View AllSubmit An Event
  • May 19, 2026

    Perimeter Fire Containment Solutions

    Credits 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEUOn-Demand This course is designed to eliminate confusion associated with perimeter fire containment systems in modern building design. Participants will gain a clear understanding of the role and value of tested perimeter fire containment systems, and how they perform as part of the building enclosure.
View AllSubmit An Event
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing