Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Breaking News

Interactive InstallationMasters Demonstration at FGIA Hybrid Fall Conference

FGIA
October 26, 2021

In-person participants at the 2021 Fenestration and Glazing Industry Alliance (FGIA) Hybrid Fall Conference had the unique opportunity to see two window installation best practices highlighted in a live demonstration by FGIA Technical Staff. Rich Rinka, Technical Manager, Fenestration Standards and U.S. Industry Affairs, and Jason Seals, Certification Services Manager, Fenestration, led conference participants through the steps of two different window installation techniques which are included in the InstallationMasters® training program: ASTM E2112 Method A1 and FMA/AAMA 100 Method C.
 
 “A window or door is only as good as its installation,” said Rinka before Seals began the demo. “InstallationMasters was developed to improve installation of residential and light commercial windows and exterior glass doors for both the new construction and replacement industries. It seeks to promote consistent, high-quality installations.”
 
 There are currently three separate segments of the InstallationMasters® program available, which address water management, installation materials and components, installation practices for various fenestration frame styles and shapes, product performance and operator types and more through classroom training.
 
 Rinka said the training course also focuses on topics such as job site safety, what to consider before beginning a job and the importance of following manufacturers’ instructions carefully. “These are the most important things we teach in these courses,” he said.

Interactive InstallationMasters® Demonstration with Rich Rinka, Technical Manager, Fenestration Standards and U.S. Industry Affairs (left), James Katsaros (center), and Jason Seals, Certification Services Manager, Fenestration (right)


 Rinka went over the three main types of exterior window and door frames: block fame, mounting flange and flush fin. “Block frames are typically used with surface barrier wall systems. Flush fin are flush with the exterior surface, and they are primarily used in retrofit applications. Mounting flange windows and doors are used with membrane/draining systems. Mounting flange windows and doors attach with fasteners through the provided openings in the flange,” he said.
 
 Prep your materials in advance, said Rinka, noting that different installation methods may require different materials per different standards. “The ASTM E2112 installation standard requires a minimum width of 9 inches for mechanically attached flashing. Wider flashing materials may be used,” he said before Seals began demonstrating that specific window installation method.
 
 “ASTM E2112 Method A1 provides guidance for installation of mounting flange window throughout the United States,” said Rinka.
 
A brief photo and video montage of this first technique can be seen on FGIA’s Instagram account in an Instagram Story Highlight titled, “IM demo” at the top of the Association’s profile.
 
 Next, Seals began to demonstrate a second window installation known as FMA/AAMA 100 Method C on a completely different mock window opening and unit. The second method was originally developed as a standard installation practice in areas with extreme wind and water conditions. This method is for installation of mounting flange windows and contains methods that use either mechanically attached flexible flashing or self-adhering flashing, per AAMA 711, which is a minimum of 4 inches in width. “Other widths are permitted with written acceptance from the window, door or flashing manufacturers,” said Rinka. In this method, a sill pan is used to assist in draining water to the exterior surface, and a weather resistive barrier is installed prior to beginning the installation process.
 
Learn more about InstallationMasters at InstallationMasters.com.
 
For more information about FGIA and its activities, visit FGIAonline.org.

KEYWORDS: fenestration glazing installations

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

skyscraper

NYC Tower Failure Offers Warning for Contractors

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • FGIA_Horizontal_RGB.jpg

    Field Testing Demonstration Shows Air Infiltration, Water Penetration Tests at FGIA Hybrid Fall Conference

    See More
  • FGIA_Horizontal_RGB.jpg

    Panel Discusses Current State of Vacuum Insulating Glazing at FGIA Hybrid Fall Conference

    See More
  • FGIA_Horizontal_RGB.jpg

    Mike Collins Shares Economic Outlook, Trends at FGIA Hybrid Fall Conference

    See More

Related Products

See More Products
  • interior design.jpg

    Building Cost Planning for the Design Team

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing