Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Low-Slope Roofs

Reconfiguring Mercy Hospital

mercy hospital
June 21, 2021

Back in 2017, Allina Health Mercy Hospital had a problem. The Minnesota health care location had simply run out of space. The solution involved relocating and enlarging the main entrance, reconfiguring the hospital’s interior and adding a parking garage.

To coordinate the large project, Mercy Hospital partnered with HDR architectural firm and Knutson Construction. Using an Integrated Project Delivery (IPD) process, the team was able to accomplish all the construction goals, including new operating rooms on the upper floor and other key additions.      

Full Exterior - Mercy Hospital“Mercy Hospital was literally busting at the seams,” says Isaac Bros, AIA, NCARB, project architect with HDR’s Minneapolis Studio. “We found the best solution was to relocate the front entrance to the opposite side of the campus. After that, the emergency department was expanded and new surgical areas were added. While all this was going on, it was important to maintain and strengthen the program adjacencies and flow of the hospital.”
 
The Mercy Hospital expansion was an enormous project, involving 168,000 square feet of space.  The design team at HDR worked with the construction team to complete the complex, seven-phase project at the Coon Rapids, Minn. location. Within those seven phases, there were 47 sub-phases of the project, resulting in a massive undertaking. Part of the project included adding a new medical surgical floor, renovating the ICU floor and expanding the registration and waiting areas.
 
Four different roof plans were created for the new structure. On and off, it took Central Roofing Company almost three years to complete the roofing work.
 
Tricky Roof Challenges
As the massive undertaking launched, Knutson Construction was brought in to build a new operating addition, central utility area and a parking ramp to a 300-space parking garage. The exterior of the structure was remodeled, and new roofing was needed in many locations.
 
“We hired Central Roofing Company to connect the older roofing sections with the new roof areas,” says Rodney Sessing, senior superintendent at Knutson Construction. “We’ve worked with Central Roofing in the past on a variety of other projects. We had confidence their crews and service teams were the perfect fit for this project.
Aerial.jpg 
“During the scope of this project there must have been at least 100 new openings made in existing roofs. Central Roofing was there for each one of them and did a great job.”

According to Bros, the challenging project benefitted from the roofing solutions offered by the Central Roofing team. “The roof was critical to this project,” says Bros. “Tying new and old roof elements to the hospital harmoniously was tricky and vital. The roof needed to maintain the proper drainage, expansion and contraction --- all while meeting the latest energy codes.
 
“Central Roofing reworked the drainage to provide a better solution for the hospital long term.”
 
Juggling Roofs and Tradespeople
For the initial new roof areas, concrete decks were installed. Johns Manville primer and a vapor barrier were added. Polyiso insulation layers were put in place, then gypsum cover board in low rise foam adhesive. A 60 mil black non-reinforced EPDM membrane was then fully adhered to the cover board. The same EPDM system was installed on two roof canopies. Johns Manville Expand-O-Flash expansion joint cover was used for all expansion joint details.
 
With the existing roof work, Firestone Una-clad 24-gauge pre-finished sheet metal was used for coping and counter-flashings. Connecting the two structures proved challenging for the entire crew.
 
“After the expansion portion of the project, we had to do detail work on the older building to make the old and new roofs unified,” says Jay Sessing, roof technician at the Service Department with Central Roofing Company. “As the project progressed, we used core drillers on the concrete decks for the multiple penetrations. Every time a trade person had to gain access to the roof to work on the project below, we were right there.
 
“We probably dealt with 30 different people on this project. There were tradesmen, construction team members and the Mercy Hospital staff. Every time the roof had to be penetrated, we’d work with electricians, plumbers, HVAC teams and mechanics. We all had the same goal of creating the best roofing system possible to top the structure.”
 
Mercy Hospital Entrance (1280x952).jpgRound 2 – Returning to Mercy Hospital
Following the successful completion and opening of the new Mercy Hospital, the Central Roofing team was called back in 2019. This time for a 7,500-square-foot temporary roof over a temporary entrance for the Emergency Department (while a new Emergency Room and entrance were being added), and to correct roof drainage and ponding issues on existing roofs.

“This was a relatively small project compared to the original project, but it was still important for the hospital,” says Kyle Forrey, project manager for Knutson Construction. “We relied on the expertise of the drafting department at Central Roofing for input and alternative ideas on how we could tie in with the existing roof.
 
“The different options Cindy Hillegass with Central Roofing provided us with in the shop drawing stages gave us confidence. With those drawings we were able to choose the best path forward to reduce the chance of water infiltration during the roof tie-in work.”
 
Working Together
Now complete, the collaborate partnership labeled “Mercy-ALIGNED” by HDR, has resulted in an outstanding hospital.
 
“We were able to all complete this project by working together as a fully integrated team,” says Bros with HDR. “We had a multidisciplinary team of architects, health care consultants, clinical partners, designers, engineers, specialists, estimators, schedulers, constructors and trade partners all focused on the same goal. We had an expansive vision for this project. In the end, Central Roofing helped us attain that vision by providing roofing solutions to all the expansion and additions of Mercy Hospital."

 

KEYWORDS: health and health care medical building Minnesota renovation

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

HITT Construction headquarters

Pushing the Envelope

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Phoenix Children’s Hospital

    Phoenix Children's Hospital Adds Mural to Walls with Durable Acrovyn by Design

    See More
  • University of Mississippi Medical Center

    Glass Atrium and Windows Daylight Children's of Mississippi Hospital

    See More
  • Manhattan’s Schwarzman Animal Medical Center interior lobby space with elevators

    Perkins&Will Transforms World's Largest Veterinary Teaching Hospital

    See More

Related Products

See More Products
  • ninteeth century.jpg

    Sustainable Building Design: Learning from nineteenth-century innovations

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing