Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Exterior CladdingsProject Profiles

An Award-Winning Renovation Project in Washington D.C.

Jack Valenti Building
Jack Valenti Building
Jack Valenti Building
Jack Valenti Building
July 27, 2020

The renovation of the historic building at 888 16th St. NW in the nation’s capital included a complete transformation of the façade, down to the precast structural members. The new façade is comprised of Portuguese limestone, granite, curtain wall and larson by Alucoil metal composite panels.

Renamed the Jack Valenti Building in 2005, the existing facility was transformed into a 180,000-square-foot “trophy-class” office building. Nine of the 12 stories are above grade. Robert Blabolil, senior associate and designer with Gensler D.C., cited a number of reasons larson panels were chosen for the façade.

“Metal composite material was selected for its durability, system depth and natural color selection,” Blabolil says. “There was limited depth in which the design team had to fit within when recladding the existing structure. The use of the metal composite material ensured the team was able to maintain an optimized system profile depth that was relative to that of the historic building façade.”

Brawner Builders coordinated the delivery and handled the installation of the Larson MCM from Alucoil, as well as the stone, curtainwall and glass for the façade. Brawner senior project manager Eric McShane says there was a lot of prep work before façade materials were ordered.

“It’s a challenge dealing with existing slab and existing columns on a building erected in the 60s,” McShane says. “We did a three-dimensional scan of the building to create a drawing of the building and then ordered everything to fit to that drawing. We worked closely with East Coast Metal Systems to coordinate the project and they did a great job of fabricating the panels.”

Steve Kerr, Director of Operations at East Coast Metal Systems of Triadelphia, WV, believes that this project was a great example of teamwork and collaboration. “Our customer, Brawner Builders, supplied us with a good set of field dimensions and from there, we were able to seamlessly fabricate the panels and meet the desired schedule,” he says. “As a Premium MCM Fabricator, we utilized our experience and state of the art technology to fabricate the desired profiles for the project. We appreciate projects with this type of cooperation and leadership.”

Brawner installed 2,470 panels (33,300 square feet) of larson MCM from Alucoil, fabricated by East Coast Metal Systems, coated with PPG’s Duranar Sunstorm Ultra-Cool, Anodic Clear.

“The façade was designed to emphasize the horizontal structure by recladding the horizontal supports with limestone,” Blabolil says. “Metal composite panels framed the overall elevation and vertical supports. Set back from the face of stone, its jointless spans created a clean transition from floor to floor, enhancing the overall composition of the building.”

Blabolil says the use of metal composite material allowed the design team to minimize joints and maximize vertical spans, creating clean transitions between window bays and maximizing daylighting into the interior space. “The system allowed for maximization of window area, giving tenants the opportunity for floor to ceiling glazing through the entire floorplate,” he says.

KEYWORDS: AEC industry building façade metal renovation

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

skyscraper

NYC Tower Failure Offers Warning for Contractors

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • 3.jpg

    USGBC’s Headquarters in Washington D.C. Earns Triple Platinum Certification: LEED, TRUE, and WELL

    See More
  • Breaking News Image #1

    First Fitwel Certification in Washington D.C.

    See More
  • 2012 GreenGov Symposium to Take Place in Washington, D.C.

    See More

Related Products

See More Products
  • 978-0-7643-3022-3.jpg

    Award-winning Green Roof Designs: Green Roofs for Healthy Cities

  • 0470872616.jpg

    Sustainable Renovation: Strategies for Commercial Building Systems and Envelope

  • studentguidebook.jpg

    Integrating Building Performance with Design: An Architecture Student’s Guidebook

See More Products

Events

View AllSubmit An Event
  • August 22, 2023

    Solar Roofing: Protect and Power Buildings in One Project

    On Demand This presentation will focus on the convergence of the roofing and solar industries: the products that are found on the market and how to incorporate solar into your construction scope for both new and existing buildings will be discussed.
View AllSubmit An Event
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing