Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Low-Slope RoofsProject Profiles

Solar Installation Energizes U.S. Headquarters

Mitsubishi Solar Project
Mitsubishi Electric US Inc. has installed a 369kW solar electric system on the rooftop of its U.S. headquarters in Cypress, Calif. Photo courtesy of Business Wire.
September 7, 2016

Mitsubishi Electric US Inc. has installed a 369kW solar electric system on the rooftop of its U.S. headquarters in Cypress, Calif. The system will significantly cut energy costs and reduce pollutants over the next 25 years.

Mitsubishi Electric Corporation was founded in 1921 and manufactures a diverse line of products, including building photovoltaic (PV) modules, automation equipment, escalators and elevators, and heating and cooling products. One of the most experienced in the solar industry, Mitsubishi Electric has manufactured solar panels for more than 40 years. Its solar modules are known in the industry for reliability, durability and as one of the first to be built with lead-free solder.

The 1,380 module Mitsubishi Electric PV system was installed at its headquarters building, located within Warland Investment Company’s Cypress Business Park, using 690 Diamond Premium and 690 Diamond Pro high-efficiency PV modules. The system can produce 547,865kWh within the first year of production – the equivalent of covering the electricity needs of 56 homes. The system can save the company 85 percent in electric costs, which totals $2 million over the next 25 years. Based on current electricity usage, the system is expected to cover 90 percent of the Mitsubishi Electric facility’s electricity needs, allowing the system to pay for itself in less than five years.

In addition to the significant financial savings, the system is expected to reduce greenhouse emissions by an estimated 424 tons annually, which is the equivalent of preventing 122 tons of waste from going into landfills.

The system was designed and installed by Sherman Oaks based installer Sun Integration. It includes 10 Yaskawa – Solectria Solar PVI 36TL transformerless, three-phase string inverters along with non-penetrating racking by PanelClaw. The ballasted racking combined with Mitsubishi Electric’s reliable, safe modules were key to obtaining a quick approval of the installation by all parties including building owner, Warland Investment Company.

“This project marks the first solar array on a Warland property,” said Chip Robertson, co-managing director of Warland Investments Company. “We believe this installation of Mitsubishi Electric’s premium quality solar panels demonstrates our commitment to creating Cypress Business Park as a premier location.”

“Mitsubishi Electric is pleased to contribute to the community and environment by producing clean energy with our own solar modules,” said Kiyoshi Furukawa, president and CEO of Mitsubishi Electric US Inc. “The system proves that businesses can be both environmentally and financially sustainable.”

KEYWORDS: photovoltaic solar panels solar roofing

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Apartment Complex Enjoys Benefits of Commercial Solar Installation

    See More
  • AGNE Rooftop Image.jpg

    The Largest Rooftop Solar Installation in New Hampshire

    See More
  • Pittsburgh University.jpg

    Innovative Inverter Solution Solves Design Challenges for 108kW Solar Installation

    See More

Events

View AllSubmit An Event
  • April 28, 2026

    Roof Design Considerations That Prevent Installation Failures and Change Orders

    Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.
View AllSubmit An Event
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing