Because time waits for no one, keeping enclosure time at a minimum was vital in the construction of the Solano County SB 1022 Classroom and Vocational Training Center in Fairfield, Calif. Building codes require the building be enclosed before much of the inside work begins, so Metl-Span’s HPCI Barrier Wall Panels were prescribed to keep construction moving along.
KWK Architects examines how the COVID-19 pandemic is going to affect the designs of residence halls to help maintain social distancing and prevent the spread of germs and viruses.
A major renovation and addition to a building that’s a part of the Tech Parks Arizona has created additional working space for potential research and development tenants. Aesthetics played a large role in the choice of insulated metal panels from Metl-Span for the addition.
The project for both schools was approximately $96 million combined in cost and included state-of-the-art technology advances, from classroom updates to science laboratories and a collaborative learning area
Opened for the 2019 academic year to students and the community, the new Goodman South Campus of Madison Area Technical College (Madison College) serves one of the most impoverished parts of Madison, Wisconsin.
The innovation hub’s unique design expands community living space for up to 530 students and assists visiting professionals to connect organically with the city and regional business community through large windows and an urban paseo
A well-designed school should foster a functional learning and work environment for students and staff while being a positive design element for the community