Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Exterior CladdingsProject Profiles

Relying on Special Teams To Accelerate Construction

SuperBowl
SuperBowl2
SuperBowl3
SuperBowl
SuperBowl2
SuperBowl3
December 27, 2017

When the NFL announced in May 2014 that its 52nd championship game would be played in Minneapolis, Minnesota in 2018, a race was on within the hospitality, commercial real estate and construction industries in the Twin Cities to capitalize on the future economic infusion from the big game.

Now, with the NFL championship game just under two months away, the final push is on to complete construction of new restaurants and hotels to accommodate the influx of football fans and the throng of media attending the big game.

One of the largest NFL championship-fueled projects was the expansion of the Mystic Lake Casino Hotel which involved construction of Mystic Lake Center, a new 180 room, 12-story hotel tower connected to a 70,000-square-foot, convention center.  The looming deadline imposed by the championship game compressed the timeline for design, permitting and construction of the project and placed a premium on creative approaches.

“We needed what I like to call our own ‘special teams’ unit to enable us to complete the project in time for the big game,” said Isaac Kendall, Project Superintendent with PCL Construction Services, Inc.’s Minneapolis district, the general contractor that led the Mystic Lake Center expansion project.  

For any large-scale construction project, one of the best ways to accelerate construction is to complete the shell of the building as soon as possible so the facility can become weather tight to allow interior work to begin. The design called for use of an Exterior Insulation and Finish System (EIFS). This continuous insulation (CI) system is among the most widely used exterior cladding materials in commercial construction.   

Many prominent buildings in Minneapolis have exterior walls built with EIFS, including the Mall of America and countless hotels.

PCL turned to Swanson & Youngdale, a 70-year-old Minnesota contractor specializing in EIFS construction, to assess options on the fastest and most effective way to construct the building envelope.    

Kevin Halvorson, Vice President of Swanson & Youngdale’s drywall division, showed PCL how they could cut months off the construction timeline if they used pre-fabricated EIFS panels that were built off site in a weather-controlled environment and brought to the construction site for faster installation.

Halvorson was confident in his company’s ability to meet the tight timeframe thanks to his partnership with the Lutz Company, a Minneapolis-based company that distributes EIFS components for Dryvit Systems, Inc., the largest EIFS manufacturer in North America.  

PCL and the Mystic Lake Casino Hotel team did their homework before giving a greenlight to the plan for pre-fabricated panels at Mystic Lake Center. “We had other companies build panels before for other jobs but never in as complicated a design,” said Kendall.  “The Mystic Lake project required floor to ceiling panels that incorporated the windows. We didn’t want to give up quality that I knew we could count on with traditional field applied EIFS, but we also knew that we didn’t have the luxury of time to use the traditional approach on the entire project.”

To assure PCL that the pre-fabricated approach would provide the same quality as field applied EIFS, yet in a fraction of the time, Swanson & Youngdale worked with the Lutz Company to develop a full section of exterior cladding with an integrated window system. After seeing the wall section, PCL was convinced. The completed section was then shown to the Design Team and Owner, both of whom signed off on the accelerated construction approach.

It took just 37 working days for a five-man crew to install 30,000 square feet of panels on the 12-story hotel tower. For the 70,000-square foot convention center, where traditional field applied EIFS had to be used because of a curved wall design, ten workers spent five months completing the job.

“I was amazed at how fast the panels of EIFS were installed on the hotel tower,” said Kendall. “Speed wasn’t the only major benefit of this approach. If we had gone the conventional way with field applied EIFS on the hotel tower, we wouldn’t have been able to install the windows until all of the EIFS was completed and the scaffolding was down. Thanks to panelization, as soon as the installation crew completed a section, I could have a caulking team come right behind them to secure the windows in place. Having multiple trades working on the project at the same time was a huge time saver.”

Halvorson estimates that the use of pre-fabricated panels shaved six months off the construction timeline. Tim Lutz knows he’ll be watching the big game on February 4, 2018. The only question is whether he watches at U.S. Bank Stadium or from the comfort of his home with friends. The answer to that question will depend on which teams are playing in the NFL championship game. What Lutz knows for sure is that Mystic Lake Center will be done on time, well before the official coin toss on February 4.

“I’m proud to have teamed with Dryvit in providing Swanson & Youngdale with a solution that gave PCL and Mystic Lake Casino Hotel the time savings they needed to get this project done in time for the ultimate game in sports,” said Lutz.

KEYWORDS: CI (continuous insulation) EIFS

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • getting to zero

    Getting to Zero Forum Convenes Professionals Working to Accelerate Climate Solutions

    See More
  • Extreme Steel logo

    Extreme Steel Inc. Announces Recapitalization to Accelerate Expansion in Structural Steel Industry

    See More
  • energy.jpg

    Biden-Harris Administration Announces $90 Million to Accelerate Building Code Adoption

    See More

Related Products

See More Products
  • business.png

    How to Succeed With Your Own Construction Business

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing