Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Building Envelope

Measured Air Leakage Requirements in Context

By Daniel Overbey
Header - Air Leakage Rates (BE).jpg

Image courtesy of author.

January 21, 2022

Whole-building pressurization testing is becoming standard practice for building projects. Many common energy conservation standards and model codes now exhibit requirements for enclosure airtightness, which are to be achieved through measured air leakage rates.

However, the requirements vary considerably. Below is a brief summary of where measured air leakage rates stand today. All of the rates have been normalized to average cubic feet per minute (CFM) per square foot (ft2) under a pressure differential of 0.3 inch water gauge (75 Pascals or 75 Pa).

Note: These measured air leakage requirements will change over time. Please note all information below is accurate as of this column's date of filing.

 

~1.00 CFM/ft2 = Poor Performing Building

As a point of reference, consider a measured building enclosure air leakage rate around 1.00 CFM/ft2 at 75 Pa to be a relatively poor-performing enclosure regarding airtightness. Some standards may cite 1.0 CFM75/ft2 as a baseline condition.

 

~0.60 CFM/ft2 = Leaky Building

A typical leaky building could be expected to exhibit a measured building enclosure air leakage rate around 0.60 CFM/ft2 at 75 Pa. You may consider this rate to be at or below standard practice.

 

0.40 CFM/ft2 = Standard Practice

By the latest editions of energy conservation standards and model codes, this may be considered standard practice today.

ANSI/ASHRAE/IES Standard 90.1-2019 calls for whole-building pressurization testing in accordance with ASTM E779 or ASTM E1827. The mandatory provision of the standard requires the measured air leakage rate of the building envelope shall not exceed 0.40 CFM75/ft2.

2021 International Energy Conservation Code (IECC) requires building thermal envelope testing in accordance with ASTM E779, ANSI/RESNET/ICC 380, ASTM E3158, or ASTM E1827 such that the measured air leakage shall not exceed 0.40 CFM75/ft2.

 

0.25 CFM/ft2 = Excellent Airtightness

The 2021 International Green Construction Code (IgCC) requires whole-building pressurization testing in accordance with ASTM E779, ASTM E1827, CAN/CGSB-149.10, CAN/GCSB-149.15, ISO 9972, or equivalent. The IgCC specifies that the measured air leakage rate of the building envelope shall not exceed 0.25 CFM75/ft2.

The US General Services Administration (GSA) P100 Facilities Standards for the Public Buildings Service (2021) references the 2018 IgCC to set a “baseline” level for enclosure airtightness of 0.25 CFM75/ft2.

The U.S. Army Corps of Engineers (USACE) Air Leakage Test Protocol for Building Envelopes (version 3, 2012) specifies a maximum building envelope air leakage rate of 0.25 CFM75/ft2.

 

<0.11 CFM/ft2 = Highest Standard in Airtightness

Any project with a measured air leakage rate at/under 0.11 CFM75/FT2 would be considered a extraordinarily airtight building. 

The Passive House U.S. (PHIUS+) 2018 Passive Building Standard requires 0.08 CFM/FT2 at 75 Pa (or 0.06 CFM/FT2 at 50 Pa) for all buildings except those that are non-combustible (i.e., no wood-based framing members or sheet goods, and no wood-based or paper-based insulation, per the guidebook) and over five stories, which are permitted a maximum air leakage rate of 0.11 CFM/FT2 at 75 Pa (or 0.08 CFM/FT2 at 50 Pa). 


Figure: Measured air leakage requirements. Image courtesy of author.

KEYWORDS: air barriers building envelope passive houses

Share This Story

Overbey   head shot 2020 3

Daniel Overbey, AIA, NCARB, LEED Fellow (LEED AP BD+C, ID+C, O+M), WELL AP is an Assistant Professor of Architecture at Ball State University and the Director of Sustainability for Browning Day in Indianapolis, Ind. His work focuses on high-performance building design and construction, environmental systems research, green building certification services, energy/life-cycle assessment modeling, and resilient design. He can be reached at djoverbey@bsu.edu.

Recent Comments

These are actually very helpful tips. It is...

This is the most beneficial blog for all...

This blog is a great resource for anyone...

Thank you for sharing this important information. I...

This is a very interesting subject of the...

Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

graph shows green, orange and red dot lines going up

LEED v5 and the Cost Impacts of ASHRAE Standard 90.1-2019

2 construction workers and a DEXcell panel

Designing Low-Slope Roofs for Resilience

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing