Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!

LCA Stages Matter When Tracking Embodied Carbon

By Daniel Overbey
life cycle changes
January 29, 2021

Over a tenth of global CO₂ emissions come from building materials 

Research suggests that buildings are responsible for about 39 percent of global CO₂ emissions.

A breakdown of this figure reveals that 28 percent of global CO₂ emissions can be attributed to building operations - commonly referred to as operational carbon; while the remaining 11 percent comes from building materials and construction—which is known as embodied carbon. 

 

We must track and reduce embodied carbon in buildings

Recognizing that operational carbon is just one piece of the climate action puzzle, when the American Institute of Architects (AIA) recently relaunched the 2030 Design Data Exchange (DDx)—a free online platform for design firms pursing the 2030 Commitment to tracks and improve upon the energy performance of their entire portfolio—a key new feature was the capability to track embodied carbon.

Unlike operational carbon, which can be reduced throughout a building’s lifetime, embodied carbon is locked in as soon as a building is constructed. As such, tracking embodied carbon is critical.

 

Scope and LCA stages make a big difference

When it comes to tracking embodied carbon, it is important to be mindful of the scope and life cycle assessment (LCA) "stages" included.

With regard to tracking embodied carbon in the DDx, a team will need to identify which of the following apply to the scope of their assessment:

  • Substructure
  • Superstructure
  • Enclosure
  • Interiors 
  • Others

The scope can make a huge difference in the total embodied carbon figures. A new multi-story commercial building is going to be responsible for much more embodied carbon than a renovation project of the same magnitude.

With regard to LCA stages, most programs that calculate embodied carbon will assess and present information in accordance with standard EN 15978. Moreover, the revamped DDx asks users to clarify which EN 15978 stages were included in embodied carbon figures being offered for a project. 

 

Standard EN 15978 defines the various stages of a building's life cycle

Standard EN 15978:2011: Sustainability of construction works - Assessment of environmental performance of buildings - Calculation method was developed by the European Committee for Standardization (CEN). This document defines a calculation method, based on LCA and other quantified environmental information, to assess the environmental performance of a building.

EN 15978 also specifies the protocol for reporting and communicating the outcome of the environmental performance assessment. The scope of EN 15978 covers all stages of a building's life cycle and is based on data obtained from a variety of information resources. The assessment includes all building related construction products, processes and services used over the life of the structure.

The figure below clarifies the various LCA stages of a building in accordance with EN 15978. Note that the standard includes both embodied and operational impacts as it includes operational energy (B6) and operational water (B7). Moreover, stage "D" goes beyond the typical "cradle to grave" life cycle of a building. Such is why identifying applicable LCA stages is critically important when qualifying and comparing embodied carbon and other LCA-related environmental impacts from buildings.

Figure 1: Building life cycle, adapted from EN 15978:2011.
Figure courtesy of author.

 

 

Do not forget about biogenic carbon

Biogenic carbon is the emissions related to the natural carbon cycle, as well as those resulting from the combustion, harvest, digestion, fermentation, decomposition or processing of biologically based materials.

Do not assume that the LCA program utilized to calculate embodied carbon for a building project considers biogenic carbon by default. If biogenic carbon was included this should be clarified when reporting embodied carbon data in the DDx or otherwise.

KEYWORDS: 2030 challenge building materials carbon reduction life-cycle assessment

Share This Story

Overbey   head shot 2020 3

Daniel Overbey, AIA, NCARB, LEED Fellow (LEED AP BD+C, ID+C, O+M), WELL AP is an Assistant Professor of Architecture at Ball State University and the Director of Sustainability for Browning Day in Indianapolis, Ind. His work focuses on high-performance building design and construction, environmental systems research, green building certification services, energy/life-cycle assessment modeling, and resilient design. He can be reached at djoverbey@bsu.edu.

Recent Comments

These are actually very helpful tips. It is...

This is the most beneficial blog for all...

This blog is a great resource for anyone...

Thank you for sharing this important information. I...

This is a very interesting subject of the...

Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

graph shows green, orange and red dot lines going up

LEED v5 and the Cost Impacts of ASHRAE Standard 90.1-2019

2 construction workers and a DEXcell panel

Designing Low-Slope Roofs for Resilience

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing