Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Insulation

The Plate Escape

Insulation Institute
July 18, 2016

In the 1963 film “The Great Escape,” we were rooting for McQueen, Bronson, Attenborough and crew to safely escape the Nazi prison camp. When it comes to air fleeing our homes, our hope is exactly the opposite. Codes and customers are pushing for more energy efficient homes, and that means tighter envelopes. Tighter homes have significant impacts on both moisture management and air quality, but at a more basic level, they are just plain hard to build. A tight home is a result of successfully combining People, Practices and Products (our 3 Ps of air sealing) to deliver the desired result. Executing requires diligence from multiple subs, at many stages of a build, typically employing multiple products, both air barrier materials and sealing accessories. This complexity begs the question: how do I prioritize my focus (and my money) to attack the biggest problems first?

Look down below

The actual prison break on which “The Great Escape” was based on the creation of a 335 foot tunnel that would allow 200 POWs to escape. For air, a major leakage point is the connection between the bottom plate and the foundation. In a 2014 report, DOE calculated the contribution of the top and bottom plate connections to the overall air leakage limit of the 2012 IECC (they used a 3 ACH50 limit for a typical home in Climate Zones 3-8). They found these two connections accounted for 50 percent of the overall leakage allowable. DOE further commented that it is common for these joints to be left unsealed. This perspective was reinforced by Matt Risinger in one of his recent videos.  In it, he mentions that use of sill sealer is very common between the bottom plate and foundation. However, contrary to what many believe, the product provides limited air sealing benefit.

Plate sealing and wall assembly tightness

Matt provides some “good-better-best” suggestions for sealing the bottom plate-foundation gap. Specifically, use of a standard elastomeric caulk as well as some interior and exterior tape options. While many different approaches can work based on performance targets and cost limitations, it is important to recognize how critical the plate joints are. The DOE report examined eight specific wall air barrier assemblies. When a wall using spray foam insulation was examined, DOE noted that “In order to maintain continuity in the air barrier assembly, the wall to foundation and the wall to roof joints were caulked.” They also stated that measured leakage “would have been much larger if only the foam had been applied.” The comment that it would have been “much larger” is due to the significant contribution of the plates to overall leakage and the inability of cavity foam to address these leakage pathways.

Teamwork and focus

600 men were involved in the preparation for the real Great Escape. What they did to make it happen is pretty staggering.1 The DOE report reinforces the importance of teamwork for air sealing too, stating that regardless of the product chosen, people and practices are integral to success, noting that:

“The general contractor needs to be educated on the various air barrier types and manufacturer’s instructions to ensure proper installation and sequencing. It is very likely that various subcontractors (e.g., framers, drywall installers, electricians and plumbers) will be collaborating on the installation of the air barrier system and on maintaining its integrity during construction. Therefore, the general contractor should coordinate all of these trades accordingly.”

This is good advice certainly, but easier said than done. To make this aspirational guidance implementable a builder must identify and prioritize high volume air leakage pathways. Telling EVERY tradesman that EVERY leakage point is equally critical is not a recipe for success. Focusing on the top leakage points, the products that can address them and the trades involved in doing so is a more realistic way of delivering the performance outcomes you’re after.

For more on this and other great blog posts, visit The Insulation Institute's website.

 

1. According to Wikipedia: “Following the escape, the Germans took an inventory of the camp and found out just how extensive the operation had been. Four thousand bed boards had gone missing, as well as the complete disappearance of 90 double bunk beds, 635 mattresses, 192 bed covers, 161 pillow cases, 52 20-man tables, 10 single tables, 34 chairs, 76 benches, 1,212 bed bolsters, 1,370 beading battens, 1219 knives, 478 spoons, 582 forks, 69 lamps, 246 water cans, 30 shovels, 300 m (1,000 ft) of electric wire, 180 m (600 ft) of rope, and 3424 towels. 1,700 blankets had been used, along with more than 1,400 Klim cans."

KEYWORDS: adhesives and sealants air barriers

Share This Story

Recent Comments

These are actually very helpful tips. It is...

This is the most beneficial blog for all...

This blog is a great resource for anyone...

Thank you for sharing this important information. I...

This is a very interesting subject of the...

Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing