Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!

Technical Details: Two Steps Forward, One Step Back

April 4, 2013

Since we started publishing ARW in 2006 I have been very consistent in one point: specifications need to be comprehensive so that they do not lend themselves to contractor interpretation. The reason for this sentiment is that in the past 25 years I have witnessed — or should I say, I have been an expert witness — in dozens of legal cases where the specification was open to the contractors’ interpretation. As you can probably surmise, this rarely ends well for anybody but the lawyers.

The latest case study in this scenario involves an exterior sealant project on a pre-cast concrete high rise building in the Midwest. The architect was hired by the owner to review previously completed exterior building studies, complete their own investigation of the building and design a series of remedies that would stop moisture infiltration into the building. The previous building studies indicated that moisture infiltration was due to openings at sealant joints at pre-cast panels and windows. The architect relied on these findings and never completed a separate investigation of the building.

Specifications and drawings were completed that indicated new sealant was required at all building joints. The contractor bid the project, completed the sealant application and was paid for the work. A month after project close-out, leaks developed at corner windows. The contractor reviewed the leaks and stated that corner tape was required and that they had not completed these joints because they were part of the structural window frame and did not require sealant. The contractor’s claim was that the existing sealant at these points was improperly applied.

The owner agreed that “corner tape” was probably the correct remedy and told the contractor they could progress with this work, but no extra fee would be paid. This is where the dance started: Step one — contractor: This was not in the specification. Step two — owner: We told the architect to correct all exterior issues. Two steps up, now one step back — architect: spec and drawings state to seal all building joints.

The drawings did state that all building joints should be sealed, but illustrations showed arrows pointing to all building joints except the corner window frames.

Time for the dip in the dance: All parties agree corner tape should be applied. The owner is willing to pay the contractor extra for material but objects to paying rigging costs and labor for joints that were supposed to be sealed. Shouldn’t this have been in the contract?

Now we dance again. Step one — contractor: This was not in the specification. Step two — owner: We told the architect to correct all exterior issues. Two steps up, now one step back: architect: Spec and drawings state to seal all building joints.

Before the next dip the lawyers may cut in.

This would not have happened with a comprehensive specification. So I will say again in 2013: specifications need to be comprehensive so that they do not lend themselves to contractor interpretation.

KEYWORDS: contractors specifications

Share This Story

Recent Comments

These are actually very helpful tips. It is...

This is the most beneficial blog for all...

This blog is a great resource for anyone...

Thank you for sharing this important information. I...

This is a very interesting subject of the...

Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing