Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Building Envelope

Pre-Construction Meetings Deliver Success

By Daniel Shields
Saint Louis University
The building facade of Saint Louis University’s Grand Hall features a 35,000-square-foot varied-width glass panel design that IWR North America furnished and installed.
Saint Louis University2
Commissioned early on during the design-assist phase, IWR North America worked as the sole building envelope contractor for this project. A large section of the building envelope’s wall panels were prefabricated off-site and the sheathing and air and water barriers were applied to the wall panels in a weather-controlled environment.
Saint Louis University3
A distinctive gray rolled zinc wall cladding system was installed on the entire building envelope of the 27,000-square-foot University of Missouri-St. Louis Grand Center facility.
Saint Louis University
Saint Louis University2
Saint Louis University3
February 16, 2018

The key to successful construction relationships requires mutual trust between all parties which should be fostered to develop a positive project culture. Keeping everyone on a project working cohesively together is a highly complex task requiring the utmost coordination, cooperation and communication. This is what makes a project profitable and the construction industry rewarding.

The first step in building those relationships begins in the pre-construction meetings. Pre-construction meetings should create a collaborative approach to information sharing that will minimize construction problems, decrease delays, and manage risks. Pre-construction meetings are a crucial part of the construction process which should be outlined in several sections of the project manual as part of the quality assurance specification. It is tremendously productive to coordinate pre-construction meetings with team members on the commercial building project as it establishes expectations for the components of the building envelope to be correctly installed.

 

What are Pre-Construction Meetings?

Pre-construction meetings are more than just a quick overview of the construction project. These meetings provide the opportunity to begin communication and problem solving between the construction team to address construction concerns early on when changes can be made on paper rather than before the start of a major project when the construction is in progress. It is best to have pre-construction meetings early and often, specifically before the bidding process and before the design phase.

The pre-construction meeting is also beneficial to clarifying design intent. Often projects will have individual elements that require extra attention to detail and execution that may not be completely obvious in the drawings and specifications. The pre-construction meeting is an appropriate time to reinforce the importance of such elements.

Having a pre-construction meeting before the commencement of field operations allows everyone the opportunity to discuss and resolve issues the various trades might encounter during the building envelope’s construction process. This meeting becomes critical to the success of the project by establishing the construction phase procedures, and by identifying milestones, areas of special requirements, lines of communication and key contacts, submittal processes, changes to the contract documents, and the goals and objectives of the project.

 

Who Should Be Involved?

Getting everyone on the same page for a commercial construction project is essential, and the right pre-construction planning can be the difference between an on-time and in-budget project that meets expectations and one that does not. A pre-construction meeting should include the building owner, design and engineering teams, general contractors, subcontractors and manufacturer representatives.

This meeting is a perfect time to review the architectural designs and blueprints, evaluate the entire project from start to finish, discuss any questions that any trade may have, and bring up any issues with design, placement or planning that could come up during the construction process.

Each trade involved should determine the top issues which they believe will affect their individual scope of responsibilities on the project. For example, the pre-construction meeting is the time to address compatibility concerns such as sealants and transitional details such as roof-to-wall, wall-to-below grade, and window to wall. Any trade working on the building envelope system should address these concerns and understand their role in ensuring that air and water are properly managed. The idea is that everyone gets a chance to think through the best ways to make the project successful. Subcontractors should assist architects, engineers and owners by advising them, when requested, on relative costs of alternates while plans are being prepared to reduce the number of change orders.

The architect should provide clarification on the building enclosure transition and penetration details to ensure that the owner gets the building performance he or she expects and purchased. Ultimately, the architect’s role is to provide the owner with a functional, durable, efficient building which is constructible, sustainable and maintainable.

When project teams work closely and have clear and frequent communications, problems that might otherwise become costly can be identified early and resolved in a cost-efficient manner. When everyone is on board from the start, there is an immense potential for uncovering design errors before construction begins when the cost to make a change to the plan is significantly less. Using a collaborative approach to communicate and share information on potential claims increases the agility of the project team to deliver a cost-effective solution.

 

Project Specific Submittals

Submittals are required primarily for the architect and engineer to verify that the correct products will be installed on the project. The contractor will use the information for handling dimensions and installation data from the submittal. The construction documents, specifically the technical specifications, require the contractor to submit product data, samples and shop drawings to the architect and engineer for approval. The submittal process gives another level of detail that usually is not included as part of the design documents.

The submittal process affects cost, quality, schedule and project success. On large commercial projects the submittal process can involve thousands of different materials, fabrications and equipment. Commercial buildings include elaborate pre-fabricated components including elevators, windows, air handling units and generators.

The architect on the project should review the submittals to verify that the contractor provides the appropriate products described in the construction documents to maintain the technical requirements of the exterior wall envelope.

The subcontractor on the project should consult with the manufacturer representative to generate submittals that show how to transition properly to the adjacent system. Most manufacturers will offer this service to the installer.

 

Things to Consider During Transition Stages

While the role of the building enclosure is to provide proper separation between the building interior and the exterior, the stages between trades needs to be looked at closely to ensure a cohesive transition. These can include transitions from one material to another, penetrations, or interruptions caused by planned openings such as windows and doors, changes in surfaces such as roof/wall junctions or parapets, or scheduling of installers.

Proper design and specification details of all these areas as well as adhering to a timely schedule are critical. Understanding the choices and developing complete details as part of construction drawings is the best way to achieve integrity and continuity of the building enclosure barriers to create air-tight, weather-resistant enclosures.

With building facades becoming more complex in design and new materials being designed to interact with each other, it is more important than ever to consider the transition stages of the building enclosure.

 

Pre-installation meetings

In addition to pre-construction meetings, pre-installation meetings take place to ensure proper collaboration between trades. These meetings are trade specific for each subcontractor who will be involved in a stage of installation. A pre-installation meeting is an opportunity to set expectations, review and clarify ambiguities relating to all drawings and specifications, product data, application manuals, applicable standards, codes, sequencing and scheduling. Also, it is vital to ensure that all team members have a clear understanding of the plan before beginning the assigned task and making sure that all steps are clearly defined and understood. A well-conducted pre-installation meeting is one of the foundations of a successful project.

KEYWORDS: building envelope cladding wall panels

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Daniel Shields is the president of Fabricated Products Group (FPG) and has approximately 20 years of industry experience. FPG, located in Chicago, Illinois, is a custom fabricator and machine job shop specializing in the design, engineering, and manufacturing of premium architectural systems and components. FPG is committed to providing exceptional quality with breakneck turnaround times. The company has two locations in the Midwest with its headquarters in the greater Chicago area, serving clients from all over the world. FPG is a subsidiary of MHS Legacy Group, a national holding corporation with roots back to 1895. For more information, email Daniel Shields at dshields@fabricatedproductsgroup.com

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

skyscraper

NYC Tower Failure Offers Warning for Contractors

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Enclosure Contractor

    Working with a Single-Source Building Enclosure Contractor

    See More
  • wire mesh

    Parking Garage Screening is Moving Full Speed Ahead

    See More
  • sunshades

    The Benefits of Sunshades for the Building Enclosure

    See More

Related Products

See More Products
  • business.png

    How to Succeed With Your Own Construction Business

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing