Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Waterproofing

Installing An Air Barrier System

How To Specify, Bid And Install A Successful Air Barrier System.

By Michael A. DeLaura
March 16, 2015

Air barriers have become an integral part of the design in wall assemblies over the last 15 years. Air barriers can be used over any substrate and behind any cladding. An air barrier can be either a building wrap, self-adhesive membrane or fluid applied packaged in a 5 gallon pail or 55 gallon drum. Building wraps and self-adhesive membranes have been used for over 25 years as substrate protection. Building paper often incorporates a self-adhesive membrane at transitions, window and door openings and substrate penetrations. Self-adhesive membranes are installed over the entire substrate including transitions, window and door openings and substrate penetrations. Some fluid applied air barriers were initially designed to function as substrate protection and as a component of a drainage EIF system.

As the demand increased for building a more energy efficient building envelope, air barriers became a product that could be used to protect the substrate regardless of the type of cladding on the exterior. The use of one continuous air barrier as substrate protection simplified the specification and design process. Air barriers provide protection against moisture intrusion, water leakage, mold and mildew. One major difference between building wraps, self-adhesive membranes and a fluid applied air barrier is performance. Air barriers, depending on the type and manufacturer, can be exposed to the elements for up to six months without a significant change in water penetration resistance. Air barriers are considered the weatherproof layer and the cladding is the decorative feature.

Features and benefits of air barriers:

  • Easy to install—does not require highly skilled labor; minimized risk of installation errors that compromise in service performance.
  • Can be “breathable”—permeable to water vapor; minimizes risk of condensation caused by vapor drive/facilitates drying or a vapor barrier based on design.
  • Structural—rigid and stable under air and wind pressure loads for self-adhesive and fluid.
  • Resists air leakage—increases occupant comfort, reduces energy costs, reduces risk of condensation caused by air leaks.
  • Efficient use of materials—doubles as air and moisture barrier; also protects rough openings.
  • NFPA 285 compliant when tested by manufacturer—which means it can be used on both combustible (Type V) and noncombustible construction (Types I-IV) for the assembly tested (and other assemblies via engineering analysis) for fluid applied.

Air barriers also lower heating and cooling cost and increase occupant comfort, and research has been conducted to prove their energy efficiency. The U.S. Department of Energy finds that up to 40 percent of the energy used to heat or cool a building can be lost through air leakage1. Another study of commercial buildings by the National Institute of Standards and Technology confirmed that air barriers promote energy savings ranging from 30 to 40 percent for heating climates and 10 to 15 percent for cooling climates2. The use of an air barrier in the wall assembly can contribute to points on a LEED Certified project in the Energy and Atmosphere Category. Points can be awarded in this category for conducting air barrier and/or building envelope testing.

Selection and Specification of the Appropriate Air Barrier

The first step is the selection of the appropriate air barrier based on the local climate, substrate and physical properties. Air barriers can be permeable or impermeable and range in thickness from 5 mils to 60 mils. A determining factor in the selection process may involve conducting a dew point analysis of the components in the wall assembly. Once the appropriate product is selected, the next step is the specification and details. The design professional should contact the manufacturer to review any unique or special details and the specification for the air barrier installation prior to the project being sent out for bid. This can be accomplished by scheduling a meeting with the manufacturer or sending a copy of the plans and specifications to the manufacturer to allow for a plan review.

Plan reviews offer a more comprehensive evaluation and typically take one to two weeks for a complete report. This is a free service that is under-utilized by the design community. It is important to involve the manufacturer through all aspects of the design and construction process from the specification to the installation. In addition to the manufacturer’s application instructions, testing and warranty information, a well written specification should require the following information to be included in the contractor’s submittals: contractor qualifications, completed installation on reference projects of similar size and complexity, letter or certificate that they have attended the manufacturer’s training seminar, manufacturer’s qualifications, code reports, typical installation details, material safety data sheets, mandatory pre-construction meeting, and the scheduling of a site mock-up.

Proper Installation

A key factor in the successful installation of an air barrier is in the details and scheduling of the application. Preconstruction meetings are recommended to provide the construction team the opportunity to review submittals, details, application procedures and construct a mock-up on site to insure that the product installed meets the intended requirements of the specification. The mock-up should include a selection of details and transitions that are representative of the project. It is important for the contractor installing the air barrier to be familiar with the manufacturer’s details, application and physical properties of their product prior to the bidding process. Contractors should attend a manufacturer’s seminar either scheduled at their office or the project site. Critical details, window and door openings, substrate penetrations, substrate transitions, connections to flashing and changes in substrates must be properly detailed and installed to make sure a correct application according to the manufacturer’s written specification. Installation may be limited in cold weather—refer to manufacturer specifications for application regarding minimum ambient and substrate temperature requirements before, during and after the application process. Application rates may vary based on the substrate type and condition and should be taken into consideration when bidding the project.

Building Wrap Installation

Building wraps are installed over the substrate in a shingle style application with the seams being overlapped 2 to 3 inches. The product is attached to the substrate with a cap fastener, or 1-inch crown staple attached to the framing 16 inches-on-center vertically and every 8 inches horizontally. All seams of the building wrap are taped with the manufacturer’s approved product. A self-adhesive membrane is installed at all penetrations, window and door openings, transitions and penetrations through the substrate.

Self-adhesive Membrane Installation

Self-adhesive membranes are installed over the substrate in a shingle style application with the seams being overlapped 2 to 3 inches. A countertop roller can be rolled over the surface to ensure proper adhesion to the substrate. Primers or adhesives can be used to promote adhesion to the substrate for application in cold weather. The self-adhesive membrane material is used at all penetrations, window and door openings, transitions and penetrations through the substrate.

Fluid Applied Air Barrier Installation

Fluid air barriers are applied to the substrate using a ½- inch or 5/8- inch nap roller, and a spray application is an acceptable method. The air barrier must be installed at the manufacturer’s wet film thickness to achieve the desired dry film thickness as referenced on the manufacturer’s product data sheet. The dry film thickness varies by substrate and must be taken into consideration when bidding a project. The contractor should have a wet film gauge on-site to ensure that the product is being installed at the recommended film thickness.

Site Observations and Quality Control

The Air Barrier Association of America, a third-party organization, offers contractor training and inspection programs for air barriers. Site observations can be conducted by the manufacturer to answer general application questions and comments on the application process. A third-party inspector should be hired by the owner or general contractor to make sure that the entire application process is according to the project and manufacturer specifications.

Conclusion

Air barriers can be building wraps, self-adhesive membranes or fluid applied. Physical properties such as color, thickness, and permeability vary by manufacturer. Proper selection, detailing and installation will ensure a profitable and successful application. Involvement of the manufacturer from the design process to project completion is an important and an integral part of a successful project. 

Footnotes:

1 U.S. DOE 2008 Building Energy Data Book Section 1.1.1 2008.

2  NISTIR 7238, “Investigation of the Impact of Commercial Building Envelope Airtightness on HVAC Energy Use.”

KEYWORDS: air barriers building envelope cladding energy efficiency walls

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Michael A. DeLaura, LEED AP BD + C is an exterior cladding specialist with Sto Corp.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Installing An Air Barrier System

    See More
  • PERMA BARRIER

    Air Barrier System

    See More
  • ECOMAXci Wall Solution

    Insulated Water and Air Barrier System

    See More

Related Products

See More Products
  • studentguidebook.jpg

    Integrating Building Performance with Design: An Architecture Student’s Guidebook

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing