Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Project Profiles

Architect Profile: Something Old, Something New

By Tom Watts
May 30, 2008
Principal architect Mark Squeo, AIA, the owner of Squeo Architecture PC in New York, is always looking for ways to optimize the end result for the building owner.

The open-air “green spaces” envelop several terrace levels.


Principal architect Mark Squeo, AIA, the owner of Squeo Architecture PC in New York, is always looking for ways to optimize the end result for the building owner. Squeo recently completed a 7,500-square-foot addition and rehabilitation of a house in a historical private community that posed several challenges.

“It was one of Bruce Price’s Shingle-Tudor style houses of the 1880s,” Squeo said.

The challenge and opportunity for the house was working with the Historical Preservation Board to bring back the look of the gables as would have been seen in the 1880s.

“Presenting to and fine-tuning with the Preservation Board started in the spring of 2006, taking many months to gain the community’s approval, and then the construction finished up early in 2008,” Squeo said.

For the addition and rehabilitation of the house, the roofs were a prominent feature of the project, and to help evoke the character of that period, Squeo had to conduct a lot of research into historical details.

“Also due to the older materials and structure making up the roof framing, the team made sure to carefully achieve proper fastening,” Squeo said.

The firm also has commercial experience, and completed Phase 1 of an expansion to an 1890 Masonry Industrial Building.

“In the 1940s there had been an addition, and we completed 10,000 square feet on top of that, roofed that new volume, and also waterproofed and pitched properly where adjoining the 1890 structure and its roof,” Squeo said.

This industrial building expansion started in 2006, and Phase 1 was completed in the fall of 2007.

“Since we were building on top of one section and alongside another, with different framing materials, connections and waterproofing, those crucial areas had to be specified well and a lot of working it out in the field between the GC, structural engineer, architect and sub doing the enclosure,” said Squeo, noting that engaging the entire team through project management strategies helps find opportunities for a better product for the client.

In Phase 1, extra attention to the details of flashing was needed due to expected differential movement where the new and old roofs crossed each other. On the success of Phase 1, now plans for Phase 2 are under way.

“In Phase 2, solar panels and/or shingles, in conjunction with extensive sky lighting, are in consideration for the renovation of the roof over the 1890 block,” Squeo said. “The research is under way to not only offset energy consumption by solar energy, but also to integrate and borrow from solar technology to assist in the growing cycle of plants, for this horticulture business.”

This graphic shows new floors and a penthouse designed to top a townhouse.

Tips on Doing Business

Squeo said the best result for the owner is to engage the engineers and construction team early.

“We discover the outermost reaches of their capabilities, and our own,” he said, “which is in stride with our mission statement, to recognize what is special in a client’s project and bring it to fruition.”

For example, when it comes to solar and green initiatives, Squeo is right in the game. “By installing vegetation on the roofs of our projects we can decrease the heat island effect,” he said. “Though not just planting them but creating the roof to be an accommodating space for the occupants, thus increasing the value of the owner’s property with an amenity - a footprint that is already there and if planned right in essence is free space the development can take advantage of.”

For Squeo’s firm, the reconstitution of the roof is quite important.

“Because this last face of the building, often ignored, if handled with care can improve the performance of the spaces with in, can help in sustainability and also increase the architectural character and experience,” he said.

Mark Squeo, principal of Squeo Architecture PC in New York, opened his firm in 2005.

Who's Who at Squeo

Mark Squeo and Ezgi Kahraman are the key architects at Squeo Architecture, which was founded in 2005 and from that core, are growing with several new projects coming up.

“One of our current projects is an extension on top of Paul Rudolph’s last built work,” Squeo said. “The existing townhouse stands in Manhattan, incomplete, clearly the top missing. Rudolph intended a slender and taller townhouse than prototypically found.”

“Unfortunately, since then the zoning and codes have changed,” Squeo continued. “We believe we can make the composition whole, though having new guidelines and a new program - still acknowledging his particular aesthetic.”

Squeo said the architectural spaces will overlap and build upon each other, then enfold out onto the upper terraces of the roofs, “which follows our philosophy that there is a moment of recognition, of perceiving - in this case, an instance at the top roof space where one recollects the experience in total,” he said. “We will take our ideas of green roofs and creating ‘green spaces’ there, along with our concern for sustainability and incorporate it, design it as the finale to the spaces leading up onto the terraces.”

Mark Squeo can be reached at Squeo Architecture PC, 246 East 58th St., Mezzanine, New York, N.Y. 10022-2011. For more information, call 646-290-6886 or 917-403-0477, fax 212-371-0335, or visit www.squeoarchitecture.com.



For more architect profiles, visit our Web site, www.arwmag.com .

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Tom Watts is the associate editor of Architectural Roofing & Waterproofing. He can be reached at 248-244-1738 or wattst@bnpmedia.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Architect Profile: In Pursuit of New Challenges

    See More
  • Architect Profile: Eric Corey Freed

    See More
  • Architect Profile: Reinhard Schneider

    See More

Related Products

See More Products
  • 41G-JcZWT+L._SX342_SY445_.jpg

    The Architect's Studio Companion: Rules of Thumb for Preliminary Design, 7th Edition

  • building codes illustated.jpg

    Building Codes Illustrated: A Guide to Understanding the 2021 International Building Code, 7th Edition

  • 0-7643-2189-7.jpg

    Green Roofs: Ecological Design and Construction

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing