Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Insulation

EPS Insulation at Pikes Peak

America’s Mountain Helps Summit House Reach New Heights in Performance

By Tom Savoy
Insulfoam
Perched at 14,115 feet above sea level, the new Summit House project is recognized as the highest ongoing construction site in North America. All photos courtesy of Insulfoam.
Insulfoam
EPS offers performance in a clean package and is one of the few types of building insulation materials that doesn’t include a barred “Red List” substance.
Insulfoam
Summit House project designers were able to achieve the R-40 designation in a single layer of EPS insulation.
Insulfoam
Lightweight EPS, cut to precise length and width to fit within precast wall panels, ensured that trucks did not surpass the 30,000-pound weight limit traveling up the mountain.
Insulfoam
At 8.5 inches thick, the rigid foam wall insulation will reduce air flow and the opportunity for thermal bridging across the building envelope.
Insulfoam
Insulfoam
Insulfoam
Insulfoam
Insulfoam
March 5, 2021

Known as the inspiration behind the familiar “America the Beautiful” lyrics, Pikes Peak—America’s Mountain, is a famed Colorado landmark as recognizable as the time-honored tune. This rugged Colorado “fourteener,” a nickname given to mountains that exceed 14,000 feet in elevation, soars 14,115 feet above sea level. Perched at the summit sits a 1960s-era Summit House, a shuttered bunker-style visitors’ center that hosts more than 750,000 sightseers and hikers annually. The facility, which permanently closed its doors to the public on January 4, 2021, will be replaced by a new $66 million structure later this year. The design team and project partners enlisted to reimagine the new Summit House, which is recognized as the highest ongoing construction site in North America, were met with a unique set of opportunities and challenges: revitalizing the sky-high tourist attraction while also adhering to the highest green building standards.

 

Big Dreams for New Summit House

From the old Pikes Peak Summit House, visitors explored winding hiking trails and enjoyed the panoramic views of Colorado Springs, Colo., beneath them. As the Summit House structure became impractical for accommodating the nearly 750,000 annual visitors it attracts, the need for an updated, easier-to-maintain facility prompted the City of Colorado Springs—in partnership with the U.S. Forest Service, U.S. Army Research Institute of Environmental Medicine and Colorado Springs Utilities—to embark on a journey to both preserve and transform the historic landmark attraction. To offer the sightseers an immersive mountaintop experience, the new Summit House facilities will be specifically designed to withstand severe temperatures, strong side winds and heavy snow fall during the winter months. Once open, the 38,000-square-foot structure will host a variety of indoor and outdoor interpretive exhibits, restaurants (featuring their legendary hot donuts) and high-altitude research and communications centers.

 

Challenges for Highest Ongoing Construction Site in North America

When ground broke at the Pikes Peak Summit House project in June of 2018, general contractor, GE Johnson, was immediately met with a wave of design challenges, including:

  • Short work seasons (late spring to late fall, weather permitting)
  • Short work shifts (to protect crew members from the nauseating effects of high-altitude)
  • Complicated transportation logistics
  • Operating in compliance with the highest energy and sustainability standards

 

Living Building Challenge

GE Johnson and design team partners are constructing the new Summit House in compliance with the terms of the Living Building Challenge (LBC), the world’s most rigorous proven performance standard for buildings. Both a philosophy and a certification program, the LBC promotes regenerative building design practices and advocates for the symbiotic relationship between people and the environment. To become a certified Living Building, the new Summit House must score high marks across seven performance areas, also known as “petals,” which focus on symbiotic building and environmental themes surrounding: place, water, energy, health + happiness, materials, equity and beauty.

The “materials petal” is the one of the more challenging designations to achieve because the project cannot contain any one of tens of thousands of materials, chemicals or elements on the “Red List.” According to Eden Brukman, vice president of the International Living Future Institute, “the Red List provides people with a shifted mindset that is going to really impact the way we think about products,” and deems it “a shining light on where the industry needs to go.”

 

EPS Holds the Key to Living Building Certification

To meet LBC qualifications and adhere to the high standards of the materials petal, the project team turned to expanded polystyrene (EPS). The rigid foam material offers performance in a clean package and is one of the few types of building insulations that doesn’t include a barred “Red List” substance.

EPS began changing the way professionals build beginning in the 1930s, when it became a sought-after material meant to replace heavy, expensive die-cast zinc. Today, EPS continues to garner a reputation as a lightweight, economical insulator across a variety of applications—ranging from single-family homes and commercial buildings to roads and cold storage facilities. Contractors and architects further rely on EPS for exterior, interior and cavity walls, as well as continuous insulation (CI) sheathing.

To enclose the new Summit House, EPS was employed between precast sandwich wall panels. In application, EPS supports CI—insulation that is continuous across all structural members without thermal bridges other than fasteners and service openings. Creating CI across exterior walls remains one of the most important steps project designers can take to construct a nearly impenetrable building envelope. In fact, the International Energy Conservation Code (IECC) has required CI across building envelopes in most climate zones both commercially and residentially since 2012. By reducing air flow and the opportunity for thermal bridging, Summit House designers can manage the building’s energy consumption, giving well-deserved attention to the “energy petal” of the LBC standards.

 

High R-value to Boot

EPS’ high, stable thermal performance also plays a role in optimizing the facility’s energy consumption. Generally speaking, the higher a material’s R-value, the better the product is at resisting the flow of heat or cold. Or, put another way, high values indicate how much thermal resistance the material has. EPS delivers R-values ranging from 3.6 to 4.2 per inch. With this level of thermal efficiency, it’s possible to achieve desired R-value without the added material or labor costs that are typically associated with building up multiple layers of insulation. In this case, Summit House project designers are able to achieve the R-40 designation in a single layer of material.

 

Field Performance

Third-party testing conducted in 2008 assessed EPS’ performance following a continuous 15-year below-grade perimeter insulation. This testing confirmed that its R-value will remain stable over its entire service life. Employed within the Summit House walls, EPS’ enduring R-value will ensure the structure is equipped to withstand years of extreme temperature changes that inevitably domineer a Colorado fourteener.

On the other hand, comparable types of foam insulation products use blowing agents that have a higher resistance to heat flow, causing the material to have a higher initial R-value at the time of manufacture. It’s now known that these blowing agents, which EPS manufacturers do not use, diffuse from the cellular structure of the foam until a level of equilibrium is reached. As the high R-value gases diffuse out of the cellular structure, the insulation’s ability to prevent thermal flow is reduced and can lose up to 30 percent of its original insulating capabilities.

 

Customizable, Lightweight EPS Eases Logistical Challenges

In addition to its constant R-value, EPS also exhibits a customizable, lightweight composition, which proved to ease some of the project design team’s more prominent logistical challenges. For example, crews were limited to 30,000 pounds of materials per truck due to the major weight restrictions for traveling up the mountain’s drastic climbs and switchbacks. Ultra-lightweight EPS, cut to precise length and width to fit within precast wall panels, ensured that loads didn’t surpass the designated weight restrictions. This tailor-made solution ensured trucks could transport it up the mountain every morning before the summit opened to the public, which helped keep construction timelines on track.  

 

EPS to Provide Long-Term Support at 14,115 Feet

With considerable construction progress made, it’s anticipated that the new Summit House will open its doors to the public by late spring or early summer of 2021. Once complete, it will be both the first project in Colorado and the first building at over 14,000 feet in altitude designed to achieve the prestigious LBC certification. The Summit House will be a testimony to the commitment made by manufacturers, the project team and stakeholders to responsible stewardship of the environment. 

With its ability to address a variety of daunting project challenges, including compliance with LBC requirements, EPS plays an integral role in this epic project. In application, its clean composition paired with its high thermal performance will help relieve the structure’s footprint on its surrounding environment. Equipped with such building materials, the Summit House will stand nobly at 14,115 feet for decades to come.

 

Those interested in staying up to date on the Pikes Peak Summit House project can watch GE Johnson’s live project webcam here.

KEYWORDS: insulation systems Living Building Challenge polystyrene

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Tom Savoy is the technical director for Insulfoam, a division of Carlisle Construction Materials. He has worked in the EPS Industry for 34 years and in construction materials (manufacturing and testing) for 40 years. Tom actively participates in many trade organizations including ASTM, SPRI and EPS IA. He can be reached at tom.savoy@insulfoam.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • VIT_PikesPeakNR_IMG1.jpg

    Glass Saves Energy, Protects Against Hurricane-force Winds atop Pikes Peak

    See More
  • EPS

    EPS Insulation Supports Energy-Efficient Buildings

    See More
  • Architectural Grade EPS Insulation

    See More

Related Products

See More Products
  • plaster and drywall

    Plaster and Drywall Assemblies Manual

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing