Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Project Profiles

Northeast Kingdom Human Services Achieves Efficiency

February 2, 2015

The Northeast Kingdom is the name given to the northeast corner of the state of Vermont. Vermonters simply call it “The Kingdom” and the written form “NEK” is often used in reference to the area. It encompasses 55 towns and unincorporated areas called gores, covering just over 2,000 square miles, or about 21 percent of the state of Vermont.

Northeast Kingdom Human Services (NKHS) provides mental health, substance abuse, and developmental services around the clock to residents of the NEK through contracts with the State of Vermont.  To better serve its clients in the wide geography of this region and bring all its services under one roof, a new facility was deemed necessary.

EHDanson Associates (EHD), an architectural firm based in St. Johnsbury, Vt., was commissioned to design the new NKHS building. The firm has earned an excellent reputation in the region for its practical approach to design, and its successful track record. Its primary design objective is to meet the client’s requirements for the project with respect to budgetary and scheduling constraints.

The new building was designed to accommodate non-clinical mental health services for the community. At 26,000 square feet, the office building wasconstructed to be almost three times larger than the agency’s previous 10,000 square foot facility. EHDanson was given a mandate to design this facility with energy efficiency as their chief concern. Their planned design included an airtight building envelope to increase thermal performance and to reduce the size of the mechanical system needed.

The exterior of the building was visually scaled to provide an inviting and pleasant appearance. The new facility, with an estimated construction cost of about $6-million, now allows for all the NKHS services to be located under one roof. Greater efficiency was achieved, saving time and resources.

The design concept also included one other primary objective: an appealing, forward looking front. EHDanson selected a field stone exterior finish at the lower level of the building with insulated metal panels at the upper level. Kingspan Insulated Panels’ KarrierPanel and Designwall 2000 products were specified for this project

The application of the thin field stone veneer presented a variety of challenges when considering the loads imposed on the structure and the continuity of the thermal envelope. The panels provided support for the thin stone veneer at the lower level, and a seamless connection to the exposed Designwall Panels above. “Our goal was to provide an envelope that was tight as well as practical,” said Roy Ward, principal at EHDanson Associates Architects, PLLC. “We opted to use Kingspan’s KarrierPanel and 18,000 square feet of Designwall 2000 to provide that continuity from foundation to the roof.”

According to Roy Ward, the continuity between both products was the biggest benefit of specifying them. “Cost was certainly a factor,” said Ward. “Alternative products such as rain screens offered similar aesthetics, but required more effort to assure the weather tightness of the building envelope.”

Construx Inc., based in Plymouth, N.H., was contracted to install the products. The company’s primary scope of business includes supply and erection of metal wall and roof panels as well as pre-engineered metal buildings. Josh Montague, project manager for Construx Inc., agreed with Ward’s assessment. “I would say cost, aesthetics, and energy efficiency are three main benefits of specifying the products,” said Montague.

Among the unique design features on this project, EHDanson integrated a sunscreen into the façade to provide passive solar protection during the summer months. This was a difficult condition to engineer because of structural needs to handle the anticipated snow load, plus the thermal bridge that was inherent in connecting through the exterior panels to the steel framing.

“The lower portion of the building incorporated a thin stone veneer system while the upper portion was a smooth insulated metal panel,” said Ward. “The marriage between the two provided some technical and aesthetic challenges as well as some structural difficulties due to the weight of the stone veneer.”

According to Ward, the insulated metal panels will be the premier specified cladding material on commercial buildings in the northeast U.S. in the future. “Certainly insulated metal panels have become a more standard cladding material for many of our commercial buildings,” said Ward. “The IMPs provide a simple system that, in the right locations, provide both interior and exterior finishes. This makes the selection of these systems economical where the interior panel skin is an acceptable finish.”

“Insulated panels in general will be a more standard product in our region due to more stringent energy codes and the ability of insulated panels to meet them,” said Montague. “Kingspan has an advantage because they have a lot of history and experience in supplying and fabricating panels.

KEYWORDS: energy efficiency insulation Kingspan metal panels

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • SCSU_HHS.2_S+P.jpg

    New University Building Creates a Campus Hub for Health and Human Services

    See More
  • American Concrete Institute and Ministry of Equipment and Water The Kingdom of Morocco sign MOU to advance concrete knowledge and standards

    American Concrete Institute and Ministry of Equipment and Water —The Kingdom of Morocco Sign MOU

    See More
  • Ken Yeang

    2020 Sustainable Cities and Human Settlements Honors Eco-Architect

    See More

Related Products

See More Products
  • heating cooling.jpg

    Heating, Cooling, Lighting: Sustainable Design Strategies Towards Net Zero Architecture, 5th Edition

  • energy modeling.jpg

    Energy Modeling and Computations in the Building Envelope

  • 1118458605.jpg

    Sustainable Facades: Design Methods for High-Performance Building Envelopes

See More Products

Events

View AllSubmit An Event
  • April 30, 2026

    Where Energy Efficiency Meets Life Safety: Polyiso CI and the Critical Role of NFPA 285

    Credits: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU On-Demand This presentation delivers a comprehensive look at the performance advantages of continuous insulation, with a special focus on polyisocyanurate (polyiso CI) solutions.
View AllSubmit An Event
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing