Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Codes

Roofing & Waterproofing Codes

June 10, 2008


Roofing Code: Chapter 15

Roofs and Roof Structures

Section 1507.2.9, Flashings

Flashing for asphalt shingles shall comply with this section. Flashing shall be applied in accordance with this section and the asphalt manufacturer’s printed instructions.

Code Interpretation:

This code implies that flashings are required for asphalt shingle systems. It also implies that the flashings shall be installed in accordance with the codes requirements and the shingle manufacturer’s latest printed specifications.

Flashings on steep-slope shingle applications are required at the eaves, ridges and at the valleys. Eaves flashing is completed by applying Ice and Water Shield or a double layer of felt at the ridge and a minimum of 36 inches up the slope.

Ridge flashing can be completed with manufactured ridge flashings that are fabricated with corrosion-resistant metal a minimum 0.019 inches (0.483 mm) thick.

Valley flashing can be comprised of ASTM D 3909 felts or ASTM D 6380 modified bitumen (smooth or mineral surfaced) applied at the valley. The felt application shall begin at the center of the valley with an equal coverage rate on each side. The valley can be open (this requires mineral-surfaced modified bitumen) or closed (covered by the shingle application).

Waterproofing Code: Chapter 18

Dampproofing and Waterproofing

1807.2, Dampproofing Required:

Where a hydrostatic pressure condition does not exist, dampproofing shall be provided and a base shall be installed under the floor and a drain installed around the foundation perimeter. A subsoil drainage system designed and constructed in accordance with Section 1807.1.3 shall be deemed adequate for lowering the ground water table.


Code Interpretation

This section implies that a subsoil drainage system is required in instances where hydrostatic pressure does not exist. The subsoil drain shall be installed by applying a base layer under the floor and installing a drain around the foundation perimeter. Proper below-grade waterproofing design must include a system for collecting, draining, and discharging groundwater away from the structure. The most effective way to properly collect and discharge groundwater is through the use of foundation drains. Foundation drains can be field-constructed drainage systems or prefabricated soil drainage systems.

Field-constructed drainage systems consist of a perforated pipe (typically PVC) that is set in a bed of gravel at the bottom of the foundation. The perforation in the pipe is applied downward to allow the water to flow into the gravel bed. A drainpipe is installed next to the structure slightly above the bottom of the foundation to prevent the soil under the foundation from washing away. The pipe is set to slope the water towards drain fields, bare soil or sump pits. A layer of coarse gravel is set around the drainage pipe for additional water accumulation. In some cases, meshes and/or mats can be applied over the top gravel layer to prevent soil buildup from interfering with water flow to the drainage system. The biggest disadvantage with these systems is that they rely on proper field construction and over time they become clogged with dirt, soil and contaminants.

It is the designer’s responsibility to review the site-engineering analysis for water table conditions and soil analysis to determine if and what type of dampproofing or waterproofing is required.

The section also implies that the groundwater table must be lowered by implementing a drainage system that is designed to meet the following engineering principles:

• Permeability of the soil.

• Rate at which water enters the drainage system.

• Rated capacity of the pumps.

• Head against which pumps are to operate.

• Rate capacity of the designed area of the system.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Building Envelope
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

2 construction workers and a DEXcell panel

Designing Low-Slope Roofs for Resilience

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Roofing & Waterproofing Codes

    See More
  • Roofing & Waterproofing Codes: June/July 2009

    See More
  • Roofing & Waterproofing Codes

    See More

Related Products

See More Products
  • building codes illustated.jpg

    Building Codes Illustrated: A Guide to Understanding the 2021 International Building Code, 7th Edition

  • 0071489738.jpeg

    Construction Waterproofing Handbook Second Edition

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing