FiberTite Launches VBX, an Air and Vapor Barrier Solution Designed To Mitigate Construction Delays
FiberTite® Roof Systems, a leader in single-ply roof membranes, has launched VBX™, a new air and vapor barrier solution that doubles as a temporary roof so that interior construction can continue long before the roof system is completed. Lengthy delays in the construction process are often the result of labor or material inaccessibility and can impact commercial facilities of all types. The FiberTite VBX Air and Vapor Barrier has exceptional durability for protecting the building and everything inside for up to 180 days, allowing the construction process to continue with ease.
“The VBX Air and Vapor Barrier is a game changer for building owners, general contractors and roofing installers because it stands up to the elements during and after construction,” said Ripa Roy, senior product manager, FiberTite Roof Systems. “VBX has lasting power for up to 180 days before the roof is installed. And as the first air and vapor barrier to receive a Class A fire rating, VBX provides added peace of mind that the building is protected throughout the construction process.”