Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Project Profiles

A Successful Hotel Re-Roof

October 29, 2015

Some projects call for just the right product and just the right installer. For the re-roofing of The Inn at The Colonnade in Baltimore, Drexel Metals and Tecta America East teamed up for a safe, successful, attractive and watertight installation.

Working 125 feet in the air, installing metal panels on open framing at steep slopes of 8:12 and 10:12, Tecta America East crews spent a lot of time staging … lifts, scaffolding and safety equipment were vital to the success of the project. The facility houses a luxury hotel as well as high-end condominiums, meaning the install had to work around the schedules of the hotel as well as the condo board.

“The biggest challenge was access,” says Steve Coyne, vice president at Tecta America East. “It’s an occupied building, so we had to always be aware of events going on at the hotel. I’d estimate that half the time we were there was spent staging, erecting and taking down scaffolding, ensuring a safe installation.”

Leaking gutters and a batten seam metal roofing system that was losing its paint forced the owners to replace the gutters and roofing. “We struggled to find the best metal roofing system for the project, including what gauge and seam height would work best,” Coyne says. “Ideally, we would have added metal decking to the open framing, but it was cost prohibitive. Drexel Metals offered some guidance and steered us to the best system.”

More than 27,000 square-feet of the company’s standing seam roofing was specified and installed. The panels, with a 1-3/4-inch standing seam height, featured a PVDF finish in Hemlock Green, similar to the color of the original panels. The open framing required a sturdier 22-gauge panel as opposed to a lighter and easier-to-work-with 24-gauge system. Clip spacing was determined by the existing purlins – most at 4-1/2 feet. Coyne says clips were closer together at the eaves and ridges.

Rick Wagner, RRC, CCS, vice president of Dedicated Roof and Hydro-Solutions LLC in Centreville, Va., was called in as a consultant/inspector during the actual roofing and gutter installation. “As with all re-roofing projects, you’re working on someone else’s imperfect framing,” Wagner says. “There were places where the structural steel framing was not perfectly aligned. Installation crews did a nice job of working around that. It’s a watertight system.”

The project was completed in March 2015.

“Issues with the leaking gutters was the impetus for making this project happen,” Wagner says. “The apron for the gutters went quite a ways up under the roofing panels, roofing clips went through the apron, so to replace the gutters and that apron, the roofing pretty much had to come off.”

Wagner says he also provided a cost analysis for repainting the roofing panels instead of replacing them, but the savings was not significant, mainly because of the difficulty involved with safe roof access for painters. “Once you take into consideration the new metal roofing system will long outlast the repainting, it was obvious that re-roofing was the best way to go,” Wagner says.

The gutters were a time-consuming part of the installation … wooden framing, covered by a peel-and-stick liner, housed the stainless steel gutters, which required soldering in some places. “That was all done by hand,” Wagner says. “Nothing was prefabricated.”

Wagner says the job was time-consuming, but to install a watertight gutter and roofing system safely at that height, working around occupied buildings, takes time. “I think Tecta did a really good job,” he says. “That system will serve the condos and hotel for a long time.”

KEYWORDS: Drexel Metals metal panels reroofing Tecta America

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

construction industry workers in hard hats stand around a city scape

Construction Industry Revolts Over New CSI Licensing Plan

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Completing a Successful School Re-Roof

    See More
  • Iconic Restoration: Famous Convention Center Undergoes Not-So-Conventional Re-Roof

    See More
  • M3-Brickell_SA V-Polyflex G_1.jpg

    Miami Re-Roof Project Completed Efficiently with Multi-Ply Roofing System

    See More

Related Products

See More Products
  • ecodesign.jpg

    Successful Building Using Ecodesign

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing