Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
SustainabilityWall Systems

Blending Security, Transparency Into High-Performing Facility

Obscured Solidity

By Amanda Gibney Weko
PA State Police
Night view showing illuminated curtainwall. Photo courtesy of Jeffrey Totaro.
PA State Police2
Trooper and staff side entry. Photo courtesy of Jeffrey Totaro.
PA State Police
PA State Police2
October 6, 2017

The new Pennsylvania State Police Headquarters in Philadelphia, Pa., debuted in late 2015 as the region’s primary public safety facility. The 54,000-square-foot complex contains 45,000 square-feet of 24-7 State Police patrol operations and 9-5 administrative space, supported by a 9,000-square-foot, five-bay municipal maintenance garage. The $16.8 million project replaced a 50-year-old building with a modern, sustainable, and efficient facility on the same site. Its colorful glass façade belies solidity, strength, and significant security features in the high-performing building envelope.

Long-Term Partnership
The Pennsylvania State Police design and construction process for a new public safety facility takes on average about 10 years from programming to move-in. The police facilities team develops a generic building footprint and asks an architect to expand or enhance this initial concept. State Police Representative Larry Gallagher admits the lengthy process often presents difficulties as focuses, programmatic complements, and technology changes, but is necessary to accommodate a multitude of security requirements. As such, it is important to select an architect with foresight and public safety experience.

For the Philadelphia Headquarters, the timeline was accelerated to just under eight years. BKP of Philadelphia was engaged for architectural design.

BKP’s depth of public safety facility experience – the firm designed troop barracks and regional safety facilities in Pennsylvania and New Jersey – meant the police and architecture teams collaborated in a proactive manner, anticipating future trends in barracks and building operations. The long-term partnership ensured the building wasn’t outdated before it was finished.

“We approached the project by considering troop efficiency and building security,” said BKP Principal Joseph Powell, AIA, LEED AP. “As with all of our projects, we build smart sustainable design strategies into our choices.”

From streamlined building floor plans to energy saving systems, the Philadelphia Headquarters has numerous elements to keep it functioning efficiently into the future.

“They understood what we were trying to accomplish,” said Gallagher. “We’re going to be in this building for a long time, and it has to last. BKP expanded on our ideas and brought a lot of thought to the process.”

Solid Program
The program for the Philadelphia Headquarters exterior had two main objectives: present a welcoming face to the community, yet protect the officers and staff inside.

Security posed the biggest design challenge. The structure had to be hardened to withstand potential vehicular impact and weapons blasts. Windows were not permitted below eight feet on the ground level or below six feet on upper floors. Surface materials needed to be solid, with no elements that stick out or could be removed and used as weapons. Landscaping – which could conceal intruders or explosives – was prohibited around the building perimeter.

These parameters might lend themselves to a fortress-like exterior with solid walls and small windows. However, the design team sought ways to merge security and sustainability to add visual interest and openness to the building.

Sense of Transparency
The building envelope incorporates precast concrete panels, constructed off-site and installed quickly onto the structure to provide the mandated solidity. A ventilated curtain wall system on three façades overlays the panels, offering a sense of transparency while regulating the building’s HVAC usage. The dual-layer exterior performs as a solar chimney: air trapped between the glass curtain wall and masonry building skin is retained to insulate the building in winter and exhausted to cool the building in summer. The metal grating that supports the curtain wall serves as both a catwalk for maintenance crews to clean the glass and as a sunshade.

The curtain wall and ribbon windows let maximum daylight into the building at the prescribed window heights, but with an overall appearance of more glass and more perceived building transparency. Careful placement of the glass and sun shades minimizes sun glare and heat gain on the building interior. The colored glazing offers further interest at night when exterior illumination makes the building appear to glow.

Sustainable Design
Sustainable features woven into the architecture and site include ground-source heat pumps with a supplemental cooling tower and energy recovery units; energy efficient lighting; radiant heat concrete floors in the maintenance garage; an exhaust system and oil and water separators to keep air and water discharges clean; a 1MW diesel generator for 100 percent emergency power; a green roof; and an advanced stormwater management system. The ventilated curtain wall further contributes to building HVAC efficiency and occupant comfort.

To compensate for extensive site surface parking, two underground water catchment basins collect the first inch of rainwater and transfer it slowly back into the ground and city storm drains. As a result, the site has zero stormwater impact and supports Philadelphia’s nationally recognized green infrastructure initiatives.

Plan for Efficiency
The plan maximizes security and troop efficiency. 24-7 operations are based on the first floor. Visitors enter through the front lobby and can only access the rest of the building via police escort. Police personnel enter at the rear nearest the staff parking lot. They traverse a single corridor to access the locker room, obtain their gear, and then exit to the patrol car parking at the opposite end of the building. The pipeline efficiency works in reverse at the end of shift.

The second floor contains 9-5 administrative functions, with a central open space available for use as a temporary command center during emergency events. Here, TV crews might congregate or the state police, local police, Secret Service, and other emergency personnel might stage operations. The crime unit is located on the third floor, farthest from public access. The garage connects to the headquarters via an enclosed vehicle maintenance and circulation courtyard, which offers an added level of security.

Award-Winning
A collaborative effort brought the project to completion under budget and on a schedule accelerated midway to accommodate Pope Francis’ visit to Philadelphia. The facility debuted in September 2015 in the international spotlight, serving as the regional security command center for the Pope’s visit.

The Construction Management Association of America (CMAA) Mid-Atlantic Chapter honored the Philadelphia Headquarters with a 2017 Project of the Year Award. The CMAA Project Achievement Awards honor those projects constructed in the Mid-Atlantic region that represent creativity and innovation through construction and program management. The project earned recognition in the Sustainability category. Powell, Gallagher, and Principal Janet Cunningham of construction management firm, JBC Associates, Inc., were on hand for the awards. Their combination of effective design, construction management, and collaboration resulted in a facility that the Pennsylvania State Police will proudly call home for the next half century.

KEYWORDS: building façade curtain wall energy efficiency

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Weko 4x4 bw
Amanda Gibney Weko is an architectural writer, communication consultant, and frequent contributor to Building Enclosure. Trained as an architect, she bridges the worlds of construction and communication, able to understand and articulate technical concepts. Her practice, AGW Communications, is based outside Philadelphia in Haddonfield, N.J. She can be reached at amanda.weko@agwdesigncommunications.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HITT Construction headquarters
    Sponsored byBuilding Composites® LLC

    Pushing the Envelope

  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

Popular Stories

Open vs. closed cell foam in an attic

Open-Cell vs. Closed-Cell Spray Foam

graphic shows white arrows pointing to the right on a light green background

A Breakdown of Air Leakage Testing in LEED v5 BD+C

graphic shows a building destoryed by tornados with information on the amount of torandos in 2026 in the US

Record-Breaking Tornado Activity in Illinois Signals New Challenges for Architects

Building Enclosure Newsletter

BE Poll

Events

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

April 28, 2026

Roof Design Considerations That Prevent Installation Failures and Change Orders

Credit: 1 AIA LU/HSW; 1 IIBEC CEH; 0.1 ICC CEU

On-Demand This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Interior of the award-winning Lenfest Center at ChesLen Preserve.

    Combining Timber Framing with High-Performance Building Envelopes

    See More
  • Timber Framing

    Old Meets New

    See More
  • Cope Linder College

    Collaborative Effort Achieves Sustainable Design

    See More

Related Products

See More Products
  • facility.jpg

    The Facility Manager's Guide to Safety and Security

  • bim-3e.jpg

    BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd Edition

  • 1118458605.jpg

    Sustainable Facades: Design Methods for High-Performance Building Envelopes

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing