Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • NEWS
    • Breaking News
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Sponsor Insights
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • MEDIA
    • Podcasts
    • Webinars
    • Quiz
    • Videos
    • Polls
    • Interactive Spotlights
    • Newsletter
    • Photo Galleries
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
  • PRODUCTS
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • ABOUT
    • Advertise
      • Editorial Calendar
    • Contact
    • eMag Archive Issues
  • SIGN UP!
Project ProfilesSustainability

DART’s Historic Structural Renovation

July 1, 2013

While there’s much to be said about the preservation of buildings for their historical significance, building reuse offers even more say about the preservation of resources and land. Therefore, it’s a great opportunity when these two ideals intersect. Such was the case in Dallas where the Monroe Shops building, originally constructed in 1914, was reborn as a police department headquarters.

Having served time as a critical maintenance facility for the Texas Interurban Railway, as a home for a paper mill and as a U-Haul outlet, the facility’s journey back to prominence began when the Dallas Area Rapid Transit (DART) purchased the structure in 1991. At that time, Monroe Shops was in a complete state of disrepair. While DART brought the structure back into working order, and got Monroe Shops listed to the National Register of Historic places in 2007, it wasn’t until 2008 when DART determined the building was the best candidate to house its growing DART Police Department that the facility truly found new life.

Lockwood, Andrews & Newnam Inc. (LAN), APM & Associates Inc. (APM), Aguirre Roden Architects, and CP&Y Inc. teamed in a joint venture dubbed TRACK3. Their goal was to turn this historic building into a serviceable home for the law-enforcement arm of the transit authority, and to do so while taking this early 20th century building to the sustainable heights sought by DART.

Alleviating a Tight Squeeze

TRACK3 met the challenge of greening this aged facility head on. Site remediation, diversion of construction waste from landfills, reduction of the heat island effect and preferred parking for fuel-efficient and low-emitting vehicles were all taken into consideration. But some of the greatest challenges faced by the project team were the structural elements of the nearly 100-year-old brick building. “Our biggest challenge structurally was to strengthen the existing load-bearing masonry with minimal connections,” says Patrick E. Jolly, PE, vice president and business group transit leader of LAN. “DART had emphasized the importance of minimal impact on the existing construction due to its historic registration. The team thought it was important to strengthen the existing structure to address the ongoing structural issues.”

Complicating the matter was the program for the DART Police Headquarters: It called for a facility of about 65,000 square feet, but the existing building had a footprint of only 35,000 square feet. How to expand the existing space to fit the program without dramatically impacting the historic integrity called for a number of solutions.

First, a building-within-a-building concept was used. Not only did this help with the original structure’s lack of insulation thanks to the addition of an interstitial airspace, it did so without a drastic change to the original exterior walls or single-pane glass. Floor space was then created by using a below-grade mechanical yard and routing all the HVAC ducts underground. An underfloor air distribution system on the second and third floors reduced the need for standard overhead configuration, while pushing the top floor (the third floor) up until the existing trusses matched the top of the upper door frames also created additional space.

Project Team
Owner: Dallas Area Rapid Transit Authority (DART)
Project Architect: Aguirre Roden Inc.
Interior Designer: Brinkley Sargent Architects
MEP Engineer: Aguirre Roden Inc.
Civil Engineer: APM & Associates Inc.
Structural Engineer: APM & Associates Inc.
Landscape Architect: Berkenbile Landscape Architects
General Contractor: Phillips May Corporation
Commissioning Agent: Henderson Engineers Inc.
LEED Consultant: Aguirre Roden Inc.
Program Manager: Lockwood Andrews & Newnam Inc.

A Structured Concept

Using the building-within-a-building concept, the team was able to further address structural issues. “We were able to include a strengthening scheme by adding tube steel mullions at the existing window wall openings and steel framing at the new wall openings,” says Joo Pang, PE, APM. “A steel channel was added to span window mullions, alleviating the concentrated loading at masonry pilaster. Historically sensitive connections of the existing masonry wall to the new structure were incorporated to stabilize the building from the inside.”

Bracing the existing walls at the new floor levels could have alleviated the loads on the bricks.  However, the suggestion was rejected due to DART’s emphasis on minimizing impact on the existing construction. Another solution that was rejected was using precast concrete culverts for underground HVAC ducts.

“Instead of precast culverts for the underground HVAC ducts, the team decided on a basement with cast-in-place, reinforced concrete construction,” says Pang. “Digging a basement within an existing building might not seem logical. However, a new basement required removal of essentially all the existing expansive clay underneath the building, which very likely caused cracking and heaving of the slab-on-grade and cracking in the masonry wall.  Also, the excavation enabled the team to strengthen the existing footing.”

 The road for the Monroe Shops building has been a long one, and it has seen its fair share of change. But the changes instituted by DART and TRACK3 have perhaps been the most significant in the building’s history. The combination of historical preservation and sustainability on this project has in fact added to this project’s significance. The DART Police Headquarters/Monroe Shops has become what is believed to be the first publicly owned building listed on the National Register of Historic Places to achieve LEED Platinum. Certainly, that’s something worth preserving. 

KEYWORDS: historic buildings LEED

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • bar graph shows LEED v4/LEED v5/LEED v6 in various colors

    When Will LEED v4 / v4.1 and LEED v5 Expire?

    The latest version of the LEED rating system, LEED v5, is...
    Sustainability
    By: Daniel Overbey
  • Celebrating Women In AEC-2026

    Celebrating Women in The AEC Industry Part 1

    A round-up of women in the design, engineering and...
    Sustainability
    By: Lindsay Lewis
  • KEE membrane application on a roof

    A Beginner’s Guide to Single-Ply Roofing Membranes

    While PVC and TPO appear extremely similar, the chemistry...
    Low-Slope Roofs
    By: Peter Gross
Manage My Account
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Building Enclosure audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Building Enclosure or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • 2 construction workers and a DEXcell panel
    Sponsored byDEXcell Roof Boards

    Designing Low-Slope Roofs for Resilience

  • Bell Bank headquarters in Fargo, North Dakota
    Sponsored bySto Corp.

    Drained and Back-Ventilated Rainscreens vs Pressurized-Equalized Rainscreens

  • A construction worker using DEXcell roof boards
    Sponsored byDEXcell Roof Boards

    The Hidden Strength of Low-Slope Roof Systems: Why Roof Cover Boards Matter

Popular Stories

a man wearing a mask installs insulation into a wall system

Quiet Rooms and Healthier Air: A Second Look at What Goes Inside the Wall Cavity

Canalino Elementary School and Canalino Family School exterior

Daylighting Design to Support Rapidly Growing Trend in Modular Building Construction

construction workers on a roof, plane flies in background

Why Specifications Are Becoming the Next Critical Layer of Construction Compliance

Building Enclosure Newsletter

BE Poll

Events

June 17, 2025

Addressing Condensation in Low-Slope Roof Assemblies

Credits: 1 AIA LU/HSW; 0.1 ICC CEU; 1 IIBEC CEH; 0.1 IACET CEU

On Demand In modern roofing systems, vapor retarders and air barriers do more than just minimize air leakage—they’re essential to maximizing performance and longevity. This engaging course dives into the next generation of moisture control: permeable vapor retarders and air barriers. Discover how these cutting-edge technologies are transforming low-slope roofing assemblies by improving energy efficiency, managing moisture, and boosting wind uplift resistance.

April 9, 2026

Strategies for High-Performance Below-Grade Waterproofing

Credits: 1 AIA LU/HSW ; 1 IIBEC CEH; 0.1 IACET CEU

On-Demand Designing a high-performance building enclosure requires more than just surface-level protection; it demands a rigorous, performance-based mastery of below-grade water and gas mitigation. This discussion will provide an expert-level analysis of below-grade waterproofing within the comprehensive framework of the high-performance building enclosure.

View All Submit An Event

Products

Plaster and Drywall Assemblies Manual

Plaster and Drywall Assemblies Manual

This is a comprehensive manual that goes beyond codes and standards, providing expert guidance in design, detailing, material selection and troubleshooting for plaster and drywall.

See More Products

Related Articles

  • Extreme Steel logo

    Extreme Steel Inc. Releases White Paper on Structural Steel in Historic Renovation Projects

    See More
  • Rutgers University-Newark Alumni Center

    Renovation and Adaptive Use of a Historic Structure

    See More
  • WaaTeeKaa

    The Role of Structural Steel Fabrication and Erection in Historic Renovations

    See More

Related Products

See More Products
  • 0470872616.jpg

    Sustainable Renovation: Strategies for Commercial Building Systems and Envelope

  • bni book

    BNi Building News Remodeling Costbook 2026 (Print Edition)

  • bni book

    BNi Building News Facilities Manager's Costbook 2026 (Print Edition)

See More Products
×

Enhance your expertise with unparalleled insights.

Join thousands of building professionals today. Shouldn’t you know what they know?

SUBSCRIBE TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing