One of the most effective ways to achieve these goals is through insulation; one of the most cost-effective ways to insulate the space you’re building or designing is with a polyisocyanurate installation for your roof.
We sat down with PIMA president Justin Koscher to discuss the role of polyiso insulation in increasing energy efficiency, and the role polyiso plays when used in below-grade for thermal resistance.
The Polyisocyanurate Insulation Manufacturers Association announced the promotion of Marcin Pazera, Ph.D., to the position of Senior Director, Technical Affairs, effective January 2024.
BASF and Carlisle Construction Materials have announced a collaboration using Lupranate® ZERO, the world’s first isocyanate with a zero carbon footprint.
As part of the multi-year project, L&M Roofing Associates, LLC, of Carnegie, PA, was hired to replace about 65,000 square feet of old rubber roofing on the Nova Place Concourse.
We sat down with PIMA president Justin Koscher to discuss the role of polyiso insulation in energy-efficient building construction and how the industry can further efforts to increase building energy efficiency and decarbonize.
A typical building loses up to 25 percent of its heat through the roof. Industry-leading Elevate roofing and insulation systems by Holcim were thus instrumental in the construction of the world’s largest Passive House-certified office building: the Winthrop Center in Boston.
Siplast announced the addition of two high-performance polyiso wall insulation products to the company’s existing WALLcontrol Air & Water-Resistive Barrier Systems, offering an exterior continuous insulation solution and supporting the company’s continued expansion into the building enclosure space.
Studio 804 is a year-long, educational opportunity for graduate students who are entering the final year of the Master of Architecture program at the University of Kansas School of Architecture and Design. Students are tasked with real-world building challenges as part of the program, including the designing, hiring of consultants, establishing budgets, getting permits and the physical act of building the entire structure.