The cosmetic manufacturing facility was first constructed in 1968, and underwent various roofing repairs since. The 210,000-square-foot building received a total re-roof upgrade; areas of the deck settling and deflection that were previously prone to water collection were corrected with the addition of SPF roof sloping materials prior to installation of a 2-ply polyester reinforced Western Colloid Roofing System with a seamless white UV reflective elastomeric ‘Cool Roof’ surfacing.